{"id":33275,"date":"2025-04-11T20:25:00","date_gmt":"2025-04-11T18:25:00","guid":{"rendered":"https:\/\/www.adriaports.com\/uncategorized\/gas-terminal-on-krk-lng-croatia-signs-financing-deal\/"},"modified":"2025-04-14T18:16:20","modified_gmt":"2025-04-14T16:16:20","slug":"gas-terminal-on-krk-lng-croatia-signs-financing-deal","status":"publish","type":"post","link":"https:\/\/www.adriaports.com\/en\/logistics\/gas-terminal-on-krk-lng-croatia-signs-financing-deal\/","title":{"rendered":"Gas terminal on Krk: LNG Croatia signs financing deal"},"content":{"rendered":"<p><strong>TRIESTE \u2013<\/strong> <a href=\"https:\/\/lng.hr\/en\/\" target=\"_blank\" rel=\"noopener\">LNG Croatia<\/a> signed a <strong>financing agreement yesterday for the capacity expansion project of the LNG terminal on the island of Krk<\/strong>.<\/p>\n<p> The \u20ac51.1 million project will <strong>increase the terminal\u2019s regasification capacity to a maximum of 6.1 billion cubic meters per year<\/strong>. The goal is to strengthen the terminal\u2019s capacity while enhancing the stability and security of natural gas supply in Croatia and neighboring regions.<\/p>\n<p>The project involves the installation of a new regasification module on the FSRU unit &#8220;LNG Croatia&#8221;, along with the necessary equipment and integration into the existing system. The initiative will be co-financed with \u20ac25 million from the National Recovery and Resilience Plan (NRRP), while LNG Croatia will cover the remaining costs through its own resources.<\/p>\n<p>The agreement was signed by Minister of Economy Ante \u0160u\u0161njar, Director of the Environmental Protection and Energy Efficiency Fund Luka Balen, and LNG Croatia CEO Ivan Fuga\u0161. \u201cWith today\u2019s agreement, we\u2019ve finalized the last steps needed to carry out the LNG terminal capacity expansion project. This agreement enables LNG Croatia, as terminal operator, to secure nearly 50% of the funds required to complete the entire project, which we are implementing in cooperation with Plinacro, the transmission system operator of the Republic of Croatia.<\/p>\n<p>The terminal\u2019s increased capacity,\u201d said <strong>Ivan Fuga\u0161, CEO of LNG Croatia<\/strong>, \u201cenhances the security of natural gas supply not only for Croatia, but also for Central and Southeastern Europe. This positions Croatia as a key energy hub for this part of Europe and the entire continent. It is worth noting that just five years ago, we were at the bottom of the natural gas supply chain\u2014and today we are becoming an industry leader.\u201d<\/p>\n","protected":false},"excerpt":{"rendered":"<p>TRIESTE \u2013 LNG Croatia signed a financing agreement yesterday for the capacity expansion project of the LNG terminal on the island of Krk.<\/p>\n","protected":false},"author":2,"featured_media":30816,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[25],"tags":[],"class_list":["post-33275","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-logistics","et-has-post-format-content","et_post_format-et-post-format-standard"],"yoast_head":"\n<title>Gas terminal on Krk: LNG Croatia signs financing deal - AdriaPorts<\/title>\n<meta name=\"description\" content=\"The \u20ac51.1 million project will raise regasification capacity to 6.1 billion cubic meters per year\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.adriaports.com\/en\/logistics\/gas-terminal-on-krk-lng-croatia-signs-financing-deal\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Gas terminal on Krk: LNG Croatia signs financing deal - AdriaPorts\" \/>\n<meta property=\"og:description\" content=\"The \u20ac51.1 million project will raise regasification capacity to 6.1 billion cubic meters per year\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.adriaports.com\/en\/logistics\/gas-terminal-on-krk-lng-croatia-signs-financing-deal\/\" \/>\n<meta property=\"og:site_name\" content=\"AdriaPorts\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/AdriaPortsShipping\" \/>\n<meta property=\"article:published_time\" content=\"2025-04-11T18:25:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-04-14T16:16:20+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.adriaports.com\/wp-content\/uploads\/2024\/09\/Gasiera-100-Veglia.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2048\" \/>\n\t<meta property=\"og:image:height\" content=\"1534\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Riccardo Coretti\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Riccardo Coretti\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/logistics\\\/gas-terminal-on-krk-lng-croatia-signs-financing-deal\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/logistics\\\/gas-terminal-on-krk-lng-croatia-signs-financing-deal\\\/\"},\"author\":{\"name\":\"Riccardo Coretti\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#\\\/schema\\\/person\\\/e1f4a3e4ab6a5399d77daa3fcfd7e9a4\"},\"headline\":\"Gas terminal on Krk: LNG Croatia signs financing deal\",\"datePublished\":\"2025-04-11T18:25:00+00:00\",\"dateModified\":\"2025-04-14T16:16:20+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/logistics\\\/gas-terminal-on-krk-lng-croatia-signs-financing-deal\\\/\"},\"wordCount\":288,\"publisher\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/logistics\\\/gas-terminal-on-krk-lng-croatia-signs-financing-deal\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.adriaports.com\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/Gasiera-100-Veglia.jpg\",\"articleSection\":[\"Logistics\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/logistics\\\/gas-terminal-on-krk-lng-croatia-signs-financing-deal\\\/\",\"url\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/logistics\\\/gas-terminal-on-krk-lng-croatia-signs-financing-deal\\\/\",\"name\":\"Gas terminal on Krk: LNG Croatia signs financing deal - AdriaPorts\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/logistics\\\/gas-terminal-on-krk-lng-croatia-signs-financing-deal\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/logistics\\\/gas-terminal-on-krk-lng-croatia-signs-financing-deal\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.adriaports.com\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/Gasiera-100-Veglia.jpg\",\"datePublished\":\"2025-04-11T18:25:00+00:00\",\"dateModified\":\"2025-04-14T16:16:20+00:00\",\"description\":\"The \u20ac51.1 million project will raise regasification capacity to 6.1 billion cubic meters per year\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/logistics\\\/gas-terminal-on-krk-lng-croatia-signs-financing-deal\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.adriaports.com\\\/en\\\/logistics\\\/gas-terminal-on-krk-lng-croatia-signs-financing-deal\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/logistics\\\/gas-terminal-on-krk-lng-croatia-signs-financing-deal\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.adriaports.com\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/Gasiera-100-Veglia.jpg\",\"contentUrl\":\"https:\\\/\\\/www.adriaports.com\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/Gasiera-100-Veglia.jpg\",\"width\":2048,\"height\":1534,\"caption\":\"The BW Pavilion Aranthera moored at the Krk terminal.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/logistics\\\/gas-terminal-on-krk-lng-croatia-signs-financing-deal\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Gas terminal on Krk: LNG Croatia signs financing deal\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/\",\"name\":\"AdriaPorts\",\"description\":\"AdriaPorts \u00e8 la principale fonte di notizie su Porti, Logistica, Ferrovie e Cantieri Navali del Nord Adriatico\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#organization\",\"name\":\"AdriaPorts\",\"url\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.adriaports.com\\\/wp-content\\\/uploads\\\/2021\\\/06\\\/logo.svg\",\"contentUrl\":\"https:\\\/\\\/www.adriaports.com\\\/wp-content\\\/uploads\\\/2021\\\/06\\\/logo.svg\",\"width\":678,\"height\":119,\"caption\":\"AdriaPorts\"},\"image\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/AdriaPortsShipping\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/adriaports\\\/\",\"https:\\\/\\\/t.me\\\/adriaports\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#\\\/schema\\\/person\\\/e1f4a3e4ab6a5399d77daa3fcfd7e9a4\",\"name\":\"Riccardo Coretti\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/af80fe5463f86bb046a71d217f7b5541ae6893d2ac1f5850b850a97dfaaf061e?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/af80fe5463f86bb046a71d217f7b5541ae6893d2ac1f5850b850a97dfaaf061e?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/af80fe5463f86bb046a71d217f7b5541ae6893d2ac1f5850b850a97dfaaf061e?s=96&d=mm&r=g\",\"caption\":\"Riccardo Coretti\"},\"url\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/author\\\/riccardo\\\/\"}]}<\/script>\n","yoast_head_json":{"title":"Gas terminal on Krk: LNG Croatia signs financing deal - AdriaPorts","description":"The \u20ac51.1 million project will raise regasification capacity to 6.1 billion cubic meters per year","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.adriaports.com\/en\/logistics\/gas-terminal-on-krk-lng-croatia-signs-financing-deal\/","og_locale":"en_US","og_type":"article","og_title":"Gas terminal on Krk: LNG Croatia signs financing deal - AdriaPorts","og_description":"The \u20ac51.1 million project will raise regasification capacity to 6.1 billion cubic meters per year","og_url":"https:\/\/www.adriaports.com\/en\/logistics\/gas-terminal-on-krk-lng-croatia-signs-financing-deal\/","og_site_name":"AdriaPorts","article_publisher":"https:\/\/www.facebook.com\/AdriaPortsShipping","article_published_time":"2025-04-11T18:25:00+00:00","article_modified_time":"2025-04-14T16:16:20+00:00","og_image":[{"width":2048,"height":1534,"url":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2024\/09\/Gasiera-100-Veglia.jpg","type":"image\/jpeg"}],"author":"Riccardo Coretti","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Riccardo Coretti","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.adriaports.com\/en\/logistics\/gas-terminal-on-krk-lng-croatia-signs-financing-deal\/#article","isPartOf":{"@id":"https:\/\/www.adriaports.com\/en\/logistics\/gas-terminal-on-krk-lng-croatia-signs-financing-deal\/"},"author":{"name":"Riccardo Coretti","@id":"https:\/\/www.adriaports.com\/en\/#\/schema\/person\/e1f4a3e4ab6a5399d77daa3fcfd7e9a4"},"headline":"Gas terminal on Krk: LNG Croatia signs financing deal","datePublished":"2025-04-11T18:25:00+00:00","dateModified":"2025-04-14T16:16:20+00:00","mainEntityOfPage":{"@id":"https:\/\/www.adriaports.com\/en\/logistics\/gas-terminal-on-krk-lng-croatia-signs-financing-deal\/"},"wordCount":288,"publisher":{"@id":"https:\/\/www.adriaports.com\/en\/#organization"},"image":{"@id":"https:\/\/www.adriaports.com\/en\/logistics\/gas-terminal-on-krk-lng-croatia-signs-financing-deal\/#primaryimage"},"thumbnailUrl":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2024\/09\/Gasiera-100-Veglia.jpg","articleSection":["Logistics"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.adriaports.com\/en\/logistics\/gas-terminal-on-krk-lng-croatia-signs-financing-deal\/","url":"https:\/\/www.adriaports.com\/en\/logistics\/gas-terminal-on-krk-lng-croatia-signs-financing-deal\/","name":"Gas terminal on Krk: LNG Croatia signs financing deal - AdriaPorts","isPartOf":{"@id":"https:\/\/www.adriaports.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.adriaports.com\/en\/logistics\/gas-terminal-on-krk-lng-croatia-signs-financing-deal\/#primaryimage"},"image":{"@id":"https:\/\/www.adriaports.com\/en\/logistics\/gas-terminal-on-krk-lng-croatia-signs-financing-deal\/#primaryimage"},"thumbnailUrl":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2024\/09\/Gasiera-100-Veglia.jpg","datePublished":"2025-04-11T18:25:00+00:00","dateModified":"2025-04-14T16:16:20+00:00","description":"The \u20ac51.1 million project will raise regasification capacity to 6.1 billion cubic meters per year","breadcrumb":{"@id":"https:\/\/www.adriaports.com\/en\/logistics\/gas-terminal-on-krk-lng-croatia-signs-financing-deal\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.adriaports.com\/en\/logistics\/gas-terminal-on-krk-lng-croatia-signs-financing-deal\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.adriaports.com\/en\/logistics\/gas-terminal-on-krk-lng-croatia-signs-financing-deal\/#primaryimage","url":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2024\/09\/Gasiera-100-Veglia.jpg","contentUrl":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2024\/09\/Gasiera-100-Veglia.jpg","width":2048,"height":1534,"caption":"The BW Pavilion Aranthera moored at the Krk terminal."},{"@type":"BreadcrumbList","@id":"https:\/\/www.adriaports.com\/en\/logistics\/gas-terminal-on-krk-lng-croatia-signs-financing-deal\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.adriaports.com\/en\/"},{"@type":"ListItem","position":2,"name":"Gas terminal on Krk: LNG Croatia signs financing deal"}]},{"@type":"WebSite","@id":"https:\/\/www.adriaports.com\/en\/#website","url":"https:\/\/www.adriaports.com\/en\/","name":"AdriaPorts","description":"AdriaPorts \u00e8 la principale fonte di notizie su Porti, Logistica, Ferrovie e Cantieri Navali del Nord Adriatico","publisher":{"@id":"https:\/\/www.adriaports.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.adriaports.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.adriaports.com\/en\/#organization","name":"AdriaPorts","url":"https:\/\/www.adriaports.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.adriaports.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2021\/06\/logo.svg","contentUrl":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2021\/06\/logo.svg","width":678,"height":119,"caption":"AdriaPorts"},"image":{"@id":"https:\/\/www.adriaports.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/AdriaPortsShipping","https:\/\/www.linkedin.com\/company\/adriaports\/","https:\/\/t.me\/adriaports"]},{"@type":"Person","@id":"https:\/\/www.adriaports.com\/en\/#\/schema\/person\/e1f4a3e4ab6a5399d77daa3fcfd7e9a4","name":"Riccardo Coretti","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/af80fe5463f86bb046a71d217f7b5541ae6893d2ac1f5850b850a97dfaaf061e?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/af80fe5463f86bb046a71d217f7b5541ae6893d2ac1f5850b850a97dfaaf061e?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/af80fe5463f86bb046a71d217f7b5541ae6893d2ac1f5850b850a97dfaaf061e?s=96&d=mm&r=g","caption":"Riccardo Coretti"},"url":"https:\/\/www.adriaports.com\/en\/author\/riccardo\/"}]}},"_links":{"self":[{"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/posts\/33275","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/comments?post=33275"}],"version-history":[{"count":3,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/posts\/33275\/revisions"}],"predecessor-version":[{"id":33278,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/posts\/33275\/revisions\/33278"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/media\/30816"}],"wp:attachment":[{"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/media?parent=33275"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/categories?post=33275"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/tags?post=33275"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}