{"id":33394,"date":"2025-04-15T22:00:32","date_gmt":"2025-04-15T20:00:32","guid":{"rendered":"https:\/\/www.adriaports.com\/uncategorized\/port-of-rijeka-rail-upgrade-construction-not-expected-before-2029\/"},"modified":"2025-04-16T16:02:45","modified_gmt":"2025-04-16T14:02:45","slug":"port-of-rijeka-rail-upgrade-construction-not-expected-before-2029","status":"publish","type":"post","link":"https:\/\/www.adriaports.com\/en\/railways\/port-of-rijeka-rail-upgrade-construction-not-expected-before-2029\/","title":{"rendered":"Port of Rijeka, rail upgrade: construction not expected before 2029"},"content":{"rendered":"<p><strong>TRIESTE \u2013<\/strong> The future of the Port of Rijeka hinges on a railway line.<br \/>\nThis was the key takeaway from a <strong>conference held recently in Zagreb by the Croatian Chamber of Commerce<\/strong>, where the spotlight was on the strategic importance of building a new double-track railway between Zagreb and Rijeka. The project is seen as crucial to boosting the port\u2019s competitiveness and expanding its economic impact at both national and regional levels. <strong>The infrastructure is expected to be completed between 2032 and 2036.<\/strong> According to a <strong>study presented by professors Davor Dujak (University of Osijek) and Borna Debeli\u0107 (Faculty of Maritime Studies in Rijeka)<\/strong>, if the railway becomes operational by 2032, the Port of Rijeka could generate up to <strong>\u20ac3.3 billion in annual economic value and create approximately 8,600 new jobs in port activities, support services, and the wider local economy<\/strong>.<\/p>\n<p>Currently, the port contributes around \u20ac740 million annually to the Croatian economy and directly employs 2,500 people. Including suppliers and related services, the port\u2019s total employment impact is estimated at 5,600 jobs.<br \/>\nThe railway will be built and upgraded in several phases. According to Ivan Kr\u0161i\u0107, president of H\u017d Infrastruktura, the earliest completion target is 2032, while the final deadline is set for 2036. Deputy Prime Minister and Minister of the Sea, Transport and Infrastructure, Oleg Butkovi\u0107, reaffirmed the government\u2019s commitment to accelerating the project as much as possible.<\/p>\n<p>The railway upgrade will be complemented by the expansion of the highway between Zagreb and Rijeka, with a third lane planned by 2029. The aim is to increase freight capacity and reduce travel times between the port and domestic and European markets.<\/p>\n<p>The railway project involves substantial investments: <strong>\u20ac1.5 billion from EU funds, \u20ac900 million from the national budget and EIB loans, and a further \u20ac6 billion expected over the next ten years<\/strong>.<br \/>\n\u201cIt\u2019s an infrastructure project of historic magnitude,\u201d said Kr\u0161i\u0107.<br \/>\nDenis Vukorepa, Director of the Port Authority of Rijeka, pointed out that the port\u2019s revenues and profits are steadily growing.<br \/>\n\u201cA one- or two-year delay in the railway won\u2019t change the course we\u2019ve set. Ten years ago, no one believed this development was possible\u2014it was just a dream,\u201d said Vukorepa.<\/p>\n<p>In addition to the <a href=\"https:\/\/www.ictsi.hr\/en\" target=\"_blank\" rel=\"noopener\">Adriatic Gate terminal in Brajdica<\/a>, the Port of Rijeka is also preparing to launch operations at its <a href=\"https:\/\/www.apmterminals.com\/en\/rijeka\" target=\"_blank\" rel=\"noopener\">new container terminal, to be managed by APM Terminals<\/a> through a joint venture between Maersk and Croatian company ENNA Logic.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>TRIESTE \u2013 The future of the Port of Rijeka hinges on a railway line.<\/p>\n","protected":false},"author":2,"featured_media":4292,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[25,26,37],"tags":[],"class_list":["post-33394","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-logistics","category-shipping-en","category-railways","et-has-post-format-content","et_post_format-et-post-format-standard"],"yoast_head":"\n<title>Port of Rijeka, rail upgrade: construction not expected before 2029 - AdriaPorts<\/title>\n<meta name=\"description\" content=\"Strategic infrastructure for the port could generate \u20ac3.3 billion in economic impact and 8,000 jobs if completed by 2032\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.adriaports.com\/en\/railways\/port-of-rijeka-rail-upgrade-construction-not-expected-before-2029\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Port of Rijeka, rail upgrade: construction not expected before 2029 - AdriaPorts\" \/>\n<meta property=\"og:description\" content=\"Strategic infrastructure for the port could generate \u20ac3.3 billion in economic impact and 8,000 jobs if completed by 2032\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.adriaports.com\/en\/railways\/port-of-rijeka-rail-upgrade-construction-not-expected-before-2029\/\" \/>\n<meta property=\"og:site_name\" content=\"AdriaPorts\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/AdriaPortsShipping\" \/>\n<meta property=\"article:published_time\" content=\"2025-04-15T20:00:32+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-04-16T14:02:45+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.adriaports.com\/wp-content\/uploads\/2022\/08\/Terminal-ferrovia-Fiume.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"544\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Riccardo Coretti\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Riccardo Coretti\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/port-of-rijeka-rail-upgrade-construction-not-expected-before-2029\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/port-of-rijeka-rail-upgrade-construction-not-expected-before-2029\\\/\"},\"author\":{\"name\":\"Riccardo Coretti\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#\\\/schema\\\/person\\\/e1f4a3e4ab6a5399d77daa3fcfd7e9a4\"},\"headline\":\"Port of Rijeka, rail upgrade: construction not expected before 2029\",\"datePublished\":\"2025-04-15T20:00:32+00:00\",\"dateModified\":\"2025-04-16T14:02:45+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/port-of-rijeka-rail-upgrade-construction-not-expected-before-2029\\\/\"},\"wordCount\":407,\"publisher\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/port-of-rijeka-rail-upgrade-construction-not-expected-before-2029\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.adriaports.com\\\/wp-content\\\/uploads\\\/2022\\\/08\\\/Terminal-ferrovia-Fiume.jpg\",\"articleSection\":[\"Logistics\",\"Shipping\",\"Railways\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/port-of-rijeka-rail-upgrade-construction-not-expected-before-2029\\\/\",\"url\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/port-of-rijeka-rail-upgrade-construction-not-expected-before-2029\\\/\",\"name\":\"Port of Rijeka, rail upgrade: construction not expected before 2029 - AdriaPorts\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/port-of-rijeka-rail-upgrade-construction-not-expected-before-2029\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/port-of-rijeka-rail-upgrade-construction-not-expected-before-2029\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.adriaports.com\\\/wp-content\\\/uploads\\\/2022\\\/08\\\/Terminal-ferrovia-Fiume.jpg\",\"datePublished\":\"2025-04-15T20:00:32+00:00\",\"dateModified\":\"2025-04-16T14:02:45+00:00\",\"description\":\"Strategic infrastructure for the port could generate \u20ac3.3 billion in economic impact and 8,000 jobs if completed by 2032\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/port-of-rijeka-rail-upgrade-construction-not-expected-before-2029\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/port-of-rijeka-rail-upgrade-construction-not-expected-before-2029\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/port-of-rijeka-rail-upgrade-construction-not-expected-before-2029\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.adriaports.com\\\/wp-content\\\/uploads\\\/2022\\\/08\\\/Terminal-ferrovia-Fiume.jpg\",\"contentUrl\":\"https:\\\/\\\/www.adriaports.com\\\/wp-content\\\/uploads\\\/2022\\\/08\\\/Terminal-ferrovia-Fiume.jpg\",\"width\":1024,\"height\":544,\"caption\":\"An overview of the rail terminal at the Port of Rijeka.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/port-of-rijeka-rail-upgrade-construction-not-expected-before-2029\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Port of Rijeka, rail upgrade: construction not expected before 2029\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/\",\"name\":\"AdriaPorts\",\"description\":\"AdriaPorts \u00e8 la principale fonte di notizie su Porti, Logistica, Ferrovie e Cantieri Navali del Nord Adriatico\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#organization\",\"name\":\"AdriaPorts\",\"url\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.adriaports.com\\\/wp-content\\\/uploads\\\/2021\\\/06\\\/logo.svg\",\"contentUrl\":\"https:\\\/\\\/www.adriaports.com\\\/wp-content\\\/uploads\\\/2021\\\/06\\\/logo.svg\",\"width\":678,\"height\":119,\"caption\":\"AdriaPorts\"},\"image\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/AdriaPortsShipping\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/adriaports\\\/\",\"https:\\\/\\\/t.me\\\/adriaports\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#\\\/schema\\\/person\\\/e1f4a3e4ab6a5399d77daa3fcfd7e9a4\",\"name\":\"Riccardo Coretti\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/af80fe5463f86bb046a71d217f7b5541ae6893d2ac1f5850b850a97dfaaf061e?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/af80fe5463f86bb046a71d217f7b5541ae6893d2ac1f5850b850a97dfaaf061e?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/af80fe5463f86bb046a71d217f7b5541ae6893d2ac1f5850b850a97dfaaf061e?s=96&d=mm&r=g\",\"caption\":\"Riccardo Coretti\"},\"url\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/author\\\/riccardo\\\/\"}]}<\/script>\n","yoast_head_json":{"title":"Port of Rijeka, rail upgrade: construction not expected before 2029 - AdriaPorts","description":"Strategic infrastructure for the port could generate \u20ac3.3 billion in economic impact and 8,000 jobs if completed by 2032","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.adriaports.com\/en\/railways\/port-of-rijeka-rail-upgrade-construction-not-expected-before-2029\/","og_locale":"en_US","og_type":"article","og_title":"Port of Rijeka, rail upgrade: construction not expected before 2029 - AdriaPorts","og_description":"Strategic infrastructure for the port could generate \u20ac3.3 billion in economic impact and 8,000 jobs if completed by 2032","og_url":"https:\/\/www.adriaports.com\/en\/railways\/port-of-rijeka-rail-upgrade-construction-not-expected-before-2029\/","og_site_name":"AdriaPorts","article_publisher":"https:\/\/www.facebook.com\/AdriaPortsShipping","article_published_time":"2025-04-15T20:00:32+00:00","article_modified_time":"2025-04-16T14:02:45+00:00","og_image":[{"width":1024,"height":544,"url":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2022\/08\/Terminal-ferrovia-Fiume.jpg","type":"image\/jpeg"}],"author":"Riccardo Coretti","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Riccardo Coretti","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.adriaports.com\/en\/railways\/port-of-rijeka-rail-upgrade-construction-not-expected-before-2029\/#article","isPartOf":{"@id":"https:\/\/www.adriaports.com\/en\/railways\/port-of-rijeka-rail-upgrade-construction-not-expected-before-2029\/"},"author":{"name":"Riccardo Coretti","@id":"https:\/\/www.adriaports.com\/en\/#\/schema\/person\/e1f4a3e4ab6a5399d77daa3fcfd7e9a4"},"headline":"Port of Rijeka, rail upgrade: construction not expected before 2029","datePublished":"2025-04-15T20:00:32+00:00","dateModified":"2025-04-16T14:02:45+00:00","mainEntityOfPage":{"@id":"https:\/\/www.adriaports.com\/en\/railways\/port-of-rijeka-rail-upgrade-construction-not-expected-before-2029\/"},"wordCount":407,"publisher":{"@id":"https:\/\/www.adriaports.com\/en\/#organization"},"image":{"@id":"https:\/\/www.adriaports.com\/en\/railways\/port-of-rijeka-rail-upgrade-construction-not-expected-before-2029\/#primaryimage"},"thumbnailUrl":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2022\/08\/Terminal-ferrovia-Fiume.jpg","articleSection":["Logistics","Shipping","Railways"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.adriaports.com\/en\/railways\/port-of-rijeka-rail-upgrade-construction-not-expected-before-2029\/","url":"https:\/\/www.adriaports.com\/en\/railways\/port-of-rijeka-rail-upgrade-construction-not-expected-before-2029\/","name":"Port of Rijeka, rail upgrade: construction not expected before 2029 - AdriaPorts","isPartOf":{"@id":"https:\/\/www.adriaports.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.adriaports.com\/en\/railways\/port-of-rijeka-rail-upgrade-construction-not-expected-before-2029\/#primaryimage"},"image":{"@id":"https:\/\/www.adriaports.com\/en\/railways\/port-of-rijeka-rail-upgrade-construction-not-expected-before-2029\/#primaryimage"},"thumbnailUrl":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2022\/08\/Terminal-ferrovia-Fiume.jpg","datePublished":"2025-04-15T20:00:32+00:00","dateModified":"2025-04-16T14:02:45+00:00","description":"Strategic infrastructure for the port could generate \u20ac3.3 billion in economic impact and 8,000 jobs if completed by 2032","breadcrumb":{"@id":"https:\/\/www.adriaports.com\/en\/railways\/port-of-rijeka-rail-upgrade-construction-not-expected-before-2029\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.adriaports.com\/en\/railways\/port-of-rijeka-rail-upgrade-construction-not-expected-before-2029\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.adriaports.com\/en\/railways\/port-of-rijeka-rail-upgrade-construction-not-expected-before-2029\/#primaryimage","url":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2022\/08\/Terminal-ferrovia-Fiume.jpg","contentUrl":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2022\/08\/Terminal-ferrovia-Fiume.jpg","width":1024,"height":544,"caption":"An overview of the rail terminal at the Port of Rijeka."},{"@type":"BreadcrumbList","@id":"https:\/\/www.adriaports.com\/en\/railways\/port-of-rijeka-rail-upgrade-construction-not-expected-before-2029\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.adriaports.com\/en\/"},{"@type":"ListItem","position":2,"name":"Port of Rijeka, rail upgrade: construction not expected before 2029"}]},{"@type":"WebSite","@id":"https:\/\/www.adriaports.com\/en\/#website","url":"https:\/\/www.adriaports.com\/en\/","name":"AdriaPorts","description":"AdriaPorts \u00e8 la principale fonte di notizie su Porti, Logistica, Ferrovie e Cantieri Navali del Nord Adriatico","publisher":{"@id":"https:\/\/www.adriaports.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.adriaports.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.adriaports.com\/en\/#organization","name":"AdriaPorts","url":"https:\/\/www.adriaports.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.adriaports.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2021\/06\/logo.svg","contentUrl":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2021\/06\/logo.svg","width":678,"height":119,"caption":"AdriaPorts"},"image":{"@id":"https:\/\/www.adriaports.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/AdriaPortsShipping","https:\/\/www.linkedin.com\/company\/adriaports\/","https:\/\/t.me\/adriaports"]},{"@type":"Person","@id":"https:\/\/www.adriaports.com\/en\/#\/schema\/person\/e1f4a3e4ab6a5399d77daa3fcfd7e9a4","name":"Riccardo Coretti","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/af80fe5463f86bb046a71d217f7b5541ae6893d2ac1f5850b850a97dfaaf061e?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/af80fe5463f86bb046a71d217f7b5541ae6893d2ac1f5850b850a97dfaaf061e?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/af80fe5463f86bb046a71d217f7b5541ae6893d2ac1f5850b850a97dfaaf061e?s=96&d=mm&r=g","caption":"Riccardo Coretti"},"url":"https:\/\/www.adriaports.com\/en\/author\/riccardo\/"}]}},"_links":{"self":[{"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/posts\/33394","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/comments?post=33394"}],"version-history":[{"count":1,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/posts\/33394\/revisions"}],"predecessor-version":[{"id":33395,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/posts\/33394\/revisions\/33395"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/media\/4292"}],"wp:attachment":[{"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/media?parent=33394"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/categories?post=33394"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/tags?post=33394"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}