{"id":33725,"date":"2025-05-03T23:55:24","date_gmt":"2025-05-03T21:55:24","guid":{"rendered":"https:\/\/www.adriaports.com\/uncategorized\/brenner-mechanical-excavation-completed-on-the-italian-side\/"},"modified":"2025-05-06T19:32:48","modified_gmt":"2025-05-06T17:32:48","slug":"brenner-mechanical-excavation-completed-on-the-italian-side","status":"publish","type":"post","link":"https:\/\/www.adriaports.com\/en\/railways\/brenner-mechanical-excavation-completed-on-the-italian-side\/","title":{"rendered":"Brenner, mechanical excavation completed on the Italian side"},"content":{"rendered":"<p><strong>TRIESTE \u2013<\/strong> With the completion of mechanical excavation on the west main tunnel, Webuild and RFI (part of the FS Italiane Group) have reached another major milestone in the construction of the Brenner Base Tunnel.<\/p>\n<p>Once finished, the <strong>64-kilometer tunnel will become the longest underground railway infrastructure in the world<\/strong>. The tunnel boring machine \u201cFlavia\u201d has completed its route, reaching the Austrian border beneath the South Tyrolean Alps. The work is part of the activities carried out by the TFB consortium on behalf of BBT SE, the project company responsible for the infrastructure, owned in Italy by RFI.<\/p>\n<p>Construction progress on the Mules 2\u20133 lot\u2014the largest section on the Italian side\u2014has now passed 95%, following the 2023 completion of the east main tunnel by TBM \u201cVirginia\u201d. In total, more than 40 kilometers have been excavated using TBM technology in this segment, involving over 65 kilometers of main and auxiliary tunnels along a complex route.<\/p>\n<p>Once completed, the Brenner Base Tunnel will connect Fortezza (BZ) and Innsbruck (AT), dramatically reducing travel time for passengers from 80 to just 25 minutes, with speeds reaching up to 250 km\/h. <strong>This project is a core section of the Munich\u2013Verona rail axis and a key link in the TEN-T Scandinavian\u2013Mediterranean Corridor, which is strategic for logistics<\/strong> and sustainable mobility across Europe.<\/p>\n<p>The project extends beyond the main tunnel: Webuild is also working on the Gola del Sill\u2013Pfons lot in Austria and has already completed the Tulfes\u2013Pfons section and the Isarco underpass. Upgrades are also underway on the Fortezza\u2013Ponte Gardena line and the Trento bypass, both essential to maximizing the new tunnel\u2019s potential.<\/p>\n<p>The new infrastructure will offer a strong alternative for both freight and passenger rail services and involves <strong>an investment of \u20ac8.8 billion<\/strong>. Initiated in 2013 with the tender process in the same year and works starting in 2014, completion of the remaining lots\u2014Lot h41 (Gola del Sill\u2013Pfons), Lot h53 (Pfons\u2013Brennero), and Lot h61 (Mules 2\u20133)\u2014is expected from 2028 onwards. As for the final phase involving equipment and technology systems, now yet to begin, completion is projected by 2032.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>TRIESTE \u2013 With the completion of mechanical excavation on the west main tunnel, Webuild and RFI (part of the FS Italiane Group) have reached another major milestone in the construction of the Brenner Base Tunnel.<\/p>\n","protected":false},"author":2,"featured_media":33677,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[25,37],"tags":[],"class_list":["post-33725","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-logistics","category-railways","et-has-post-format-content","et_post_format-et-post-format-standard"],"yoast_head":"\n<title>Brenner, mechanical excavation completed on the Italian side - AdriaPorts<\/title>\n<meta name=\"description\" content=\"Base Tunnel nearing completion: with 64 km, it will be the world\u2019s longest railway tunnel and will transform Alpine transport\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.adriaports.com\/en\/railways\/brenner-mechanical-excavation-completed-on-the-italian-side\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Brenner, mechanical excavation completed on the Italian side - AdriaPorts\" \/>\n<meta property=\"og:description\" content=\"Base Tunnel nearing completion: with 64 km, it will be the world\u2019s longest railway tunnel and will transform Alpine transport\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.adriaports.com\/en\/railways\/brenner-mechanical-excavation-completed-on-the-italian-side\/\" \/>\n<meta property=\"og:site_name\" content=\"AdriaPorts\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/AdriaPortsShipping\" \/>\n<meta property=\"article:published_time\" content=\"2025-05-03T21:55:24+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-05-06T17:32:48+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.adriaports.com\/wp-content\/uploads\/2025\/05\/Galleria-di-Base-del-Brennero-Lotto-Mules-2-3-Credits-BBT-SE.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"1080\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"author\" content=\"Riccardo Coretti\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Riccardo Coretti\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/brenner-mechanical-excavation-completed-on-the-italian-side\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/brenner-mechanical-excavation-completed-on-the-italian-side\\\/\"},\"author\":{\"name\":\"Riccardo Coretti\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#\\\/schema\\\/person\\\/e1f4a3e4ab6a5399d77daa3fcfd7e9a4\"},\"headline\":\"Brenner, mechanical excavation completed on the Italian side\",\"datePublished\":\"2025-05-03T21:55:24+00:00\",\"dateModified\":\"2025-05-06T17:32:48+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/brenner-mechanical-excavation-completed-on-the-italian-side\\\/\"},\"wordCount\":351,\"publisher\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/brenner-mechanical-excavation-completed-on-the-italian-side\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.adriaports.com\\\/wp-content\\\/uploads\\\/2025\\\/05\\\/Galleria-di-Base-del-Brennero-Lotto-Mules-2-3-Credits-BBT-SE.webp\",\"articleSection\":[\"Logistics\",\"Railways\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/brenner-mechanical-excavation-completed-on-the-italian-side\\\/\",\"url\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/brenner-mechanical-excavation-completed-on-the-italian-side\\\/\",\"name\":\"Brenner, mechanical excavation completed on the Italian side - AdriaPorts\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/brenner-mechanical-excavation-completed-on-the-italian-side\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/brenner-mechanical-excavation-completed-on-the-italian-side\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.adriaports.com\\\/wp-content\\\/uploads\\\/2025\\\/05\\\/Galleria-di-Base-del-Brennero-Lotto-Mules-2-3-Credits-BBT-SE.webp\",\"datePublished\":\"2025-05-03T21:55:24+00:00\",\"dateModified\":\"2025-05-06T17:32:48+00:00\",\"description\":\"Base Tunnel nearing completion: with 64 km, it will be the world\u2019s longest railway tunnel and will transform Alpine transport\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/brenner-mechanical-excavation-completed-on-the-italian-side\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/brenner-mechanical-excavation-completed-on-the-italian-side\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/brenner-mechanical-excavation-completed-on-the-italian-side\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.adriaports.com\\\/wp-content\\\/uploads\\\/2025\\\/05\\\/Galleria-di-Base-del-Brennero-Lotto-Mules-2-3-Credits-BBT-SE.webp\",\"contentUrl\":\"https:\\\/\\\/www.adriaports.com\\\/wp-content\\\/uploads\\\/2025\\\/05\\\/Galleria-di-Base-del-Brennero-Lotto-Mules-2-3-Credits-BBT-SE.webp\",\"width\":1920,\"height\":1080,\"caption\":\"Brenner Base Tunnel, Mules 2\u20133 lot \u2013 Credits: BBT SE\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/brenner-mechanical-excavation-completed-on-the-italian-side\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Brenner, mechanical excavation completed on the Italian side\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/\",\"name\":\"AdriaPorts\",\"description\":\"AdriaPorts \u00e8 la principale fonte di notizie su Porti, Logistica, Ferrovie e Cantieri Navali del Nord Adriatico\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#organization\",\"name\":\"AdriaPorts\",\"url\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.adriaports.com\\\/wp-content\\\/uploads\\\/2021\\\/06\\\/logo.svg\",\"contentUrl\":\"https:\\\/\\\/www.adriaports.com\\\/wp-content\\\/uploads\\\/2021\\\/06\\\/logo.svg\",\"width\":678,\"height\":119,\"caption\":\"AdriaPorts\"},\"image\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/AdriaPortsShipping\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/adriaports\\\/\",\"https:\\\/\\\/t.me\\\/adriaports\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#\\\/schema\\\/person\\\/e1f4a3e4ab6a5399d77daa3fcfd7e9a4\",\"name\":\"Riccardo Coretti\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/af80fe5463f86bb046a71d217f7b5541ae6893d2ac1f5850b850a97dfaaf061e?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/af80fe5463f86bb046a71d217f7b5541ae6893d2ac1f5850b850a97dfaaf061e?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/af80fe5463f86bb046a71d217f7b5541ae6893d2ac1f5850b850a97dfaaf061e?s=96&d=mm&r=g\",\"caption\":\"Riccardo Coretti\"},\"url\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/author\\\/riccardo\\\/\"}]}<\/script>\n","yoast_head_json":{"title":"Brenner, mechanical excavation completed on the Italian side - AdriaPorts","description":"Base Tunnel nearing completion: with 64 km, it will be the world\u2019s longest railway tunnel and will transform Alpine transport","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.adriaports.com\/en\/railways\/brenner-mechanical-excavation-completed-on-the-italian-side\/","og_locale":"en_US","og_type":"article","og_title":"Brenner, mechanical excavation completed on the Italian side - AdriaPorts","og_description":"Base Tunnel nearing completion: with 64 km, it will be the world\u2019s longest railway tunnel and will transform Alpine transport","og_url":"https:\/\/www.adriaports.com\/en\/railways\/brenner-mechanical-excavation-completed-on-the-italian-side\/","og_site_name":"AdriaPorts","article_publisher":"https:\/\/www.facebook.com\/AdriaPortsShipping","article_published_time":"2025-05-03T21:55:24+00:00","article_modified_time":"2025-05-06T17:32:48+00:00","og_image":[{"width":1920,"height":1080,"url":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2025\/05\/Galleria-di-Base-del-Brennero-Lotto-Mules-2-3-Credits-BBT-SE.webp","type":"image\/webp"}],"author":"Riccardo Coretti","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Riccardo Coretti","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.adriaports.com\/en\/railways\/brenner-mechanical-excavation-completed-on-the-italian-side\/#article","isPartOf":{"@id":"https:\/\/www.adriaports.com\/en\/railways\/brenner-mechanical-excavation-completed-on-the-italian-side\/"},"author":{"name":"Riccardo Coretti","@id":"https:\/\/www.adriaports.com\/en\/#\/schema\/person\/e1f4a3e4ab6a5399d77daa3fcfd7e9a4"},"headline":"Brenner, mechanical excavation completed on the Italian side","datePublished":"2025-05-03T21:55:24+00:00","dateModified":"2025-05-06T17:32:48+00:00","mainEntityOfPage":{"@id":"https:\/\/www.adriaports.com\/en\/railways\/brenner-mechanical-excavation-completed-on-the-italian-side\/"},"wordCount":351,"publisher":{"@id":"https:\/\/www.adriaports.com\/en\/#organization"},"image":{"@id":"https:\/\/www.adriaports.com\/en\/railways\/brenner-mechanical-excavation-completed-on-the-italian-side\/#primaryimage"},"thumbnailUrl":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2025\/05\/Galleria-di-Base-del-Brennero-Lotto-Mules-2-3-Credits-BBT-SE.webp","articleSection":["Logistics","Railways"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.adriaports.com\/en\/railways\/brenner-mechanical-excavation-completed-on-the-italian-side\/","url":"https:\/\/www.adriaports.com\/en\/railways\/brenner-mechanical-excavation-completed-on-the-italian-side\/","name":"Brenner, mechanical excavation completed on the Italian side - AdriaPorts","isPartOf":{"@id":"https:\/\/www.adriaports.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.adriaports.com\/en\/railways\/brenner-mechanical-excavation-completed-on-the-italian-side\/#primaryimage"},"image":{"@id":"https:\/\/www.adriaports.com\/en\/railways\/brenner-mechanical-excavation-completed-on-the-italian-side\/#primaryimage"},"thumbnailUrl":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2025\/05\/Galleria-di-Base-del-Brennero-Lotto-Mules-2-3-Credits-BBT-SE.webp","datePublished":"2025-05-03T21:55:24+00:00","dateModified":"2025-05-06T17:32:48+00:00","description":"Base Tunnel nearing completion: with 64 km, it will be the world\u2019s longest railway tunnel and will transform Alpine transport","breadcrumb":{"@id":"https:\/\/www.adriaports.com\/en\/railways\/brenner-mechanical-excavation-completed-on-the-italian-side\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.adriaports.com\/en\/railways\/brenner-mechanical-excavation-completed-on-the-italian-side\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.adriaports.com\/en\/railways\/brenner-mechanical-excavation-completed-on-the-italian-side\/#primaryimage","url":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2025\/05\/Galleria-di-Base-del-Brennero-Lotto-Mules-2-3-Credits-BBT-SE.webp","contentUrl":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2025\/05\/Galleria-di-Base-del-Brennero-Lotto-Mules-2-3-Credits-BBT-SE.webp","width":1920,"height":1080,"caption":"Brenner Base Tunnel, Mules 2\u20133 lot \u2013 Credits: BBT SE"},{"@type":"BreadcrumbList","@id":"https:\/\/www.adriaports.com\/en\/railways\/brenner-mechanical-excavation-completed-on-the-italian-side\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.adriaports.com\/en\/"},{"@type":"ListItem","position":2,"name":"Brenner, mechanical excavation completed on the Italian side"}]},{"@type":"WebSite","@id":"https:\/\/www.adriaports.com\/en\/#website","url":"https:\/\/www.adriaports.com\/en\/","name":"AdriaPorts","description":"AdriaPorts \u00e8 la principale fonte di notizie su Porti, Logistica, Ferrovie e Cantieri Navali del Nord Adriatico","publisher":{"@id":"https:\/\/www.adriaports.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.adriaports.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.adriaports.com\/en\/#organization","name":"AdriaPorts","url":"https:\/\/www.adriaports.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.adriaports.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2021\/06\/logo.svg","contentUrl":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2021\/06\/logo.svg","width":678,"height":119,"caption":"AdriaPorts"},"image":{"@id":"https:\/\/www.adriaports.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/AdriaPortsShipping","https:\/\/www.linkedin.com\/company\/adriaports\/","https:\/\/t.me\/adriaports"]},{"@type":"Person","@id":"https:\/\/www.adriaports.com\/en\/#\/schema\/person\/e1f4a3e4ab6a5399d77daa3fcfd7e9a4","name":"Riccardo Coretti","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/af80fe5463f86bb046a71d217f7b5541ae6893d2ac1f5850b850a97dfaaf061e?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/af80fe5463f86bb046a71d217f7b5541ae6893d2ac1f5850b850a97dfaaf061e?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/af80fe5463f86bb046a71d217f7b5541ae6893d2ac1f5850b850a97dfaaf061e?s=96&d=mm&r=g","caption":"Riccardo Coretti"},"url":"https:\/\/www.adriaports.com\/en\/author\/riccardo\/"}]}},"_links":{"self":[{"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/posts\/33725","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/comments?post=33725"}],"version-history":[{"count":1,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/posts\/33725\/revisions"}],"predecessor-version":[{"id":33726,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/posts\/33725\/revisions\/33726"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/media\/33677"}],"wp:attachment":[{"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/media?parent=33725"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/categories?post=33725"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/tags?post=33725"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}