{"id":34447,"date":"2025-07-08T19:13:18","date_gmt":"2025-07-08T17:13:18","guid":{"rendered":"https:\/\/www.adriaports.com\/uncategorized\/koper-piling-works-begin-for-pier-i-expansion\/"},"modified":"2025-07-13T17:35:57","modified_gmt":"2025-07-13T15:35:57","slug":"koper-piling-works-begin-for-pier-i-expansion","status":"publish","type":"post","link":"https:\/\/www.adriaports.com\/en\/logistics\/koper-piling-works-begin-for-pier-i-expansion\/","title":{"rendered":"Koper, piling works begin for Pier I expansion"},"content":{"rendered":"<p><strong>TRIESTE \u2013<\/strong> This week, <strong>construction will begin at the Port of Koper on the northern extension of Pier I, starting with the installation of the first steel piles<\/strong>.<\/p>\n<p>This marks the initial phase of a strategic project to boost container traffic, with the <a href=\"https:\/\/www.adriaports.com\/it\/logistica\/porto-di-capodistria-firmato-contratto-per-ampliamento-terminal-container\/\">new operational infrastructure set to be completed by the end of 2027<\/a>. The work involves the gradual installation of 1,750 piles, each measuring between 60 and 70 meters in length, at a maximum rate of 100 piles per month. Operations will take place only on weekdays, between 7 a.m. and 6 p.m., and will be subject to specific environmental conditions. Dredging to a depth of 16 meters and area preparation have already been completed, while two shipments carrying 250 piles each (totaling 5,500 tons) have arrived in recent weeks along with the pile-driving equipment.<\/p>\n<p>The project \u2013 awarded to Kolektor Koling In\u017eeniring in partnership with CGP \u2013 includes the construction of <strong>326 meters of quay with two new berths<\/strong>, the expansion of operational space with <strong>7 hectares of new yard area, marine dredging, and all complementary infrastructure<\/strong>. Once completed, the container terminal\u2019s capacity will increase to 1.8 million TEUs per year.<\/p>\n<p>The piles will be installed in two stages: initially to 80% of the depth using vibration, with the remaining 20% driven into place. The entire process will be subject to close environmental monitoring: in addition to standard parameters such as noise and dust, vibration and water turbidity will also be measured to ensure minimal environmental impact.<\/p>\n<p>The piles will be topped with prefabricated reinforced concrete caps and connected to prefabricated beams and crossbeams. As in the southern extension of the pier, a <strong>70-centimeter-thick concrete slab will be built, waterproofed and overlaid with a second 30-centimeter slab<\/strong>.<\/p>\n<p>The total value of the contract, also published at the EU level, amounts to <strong>\u20ac152.9 million (excluding VAT)<\/strong>. <a href=\"https:\/\/www.luka-kp.si\/en\/\" target=\"_blank\" rel=\"noopener\">Luka Koper, the port operating company<\/a>, considers this investment essential to meet growing demand and to strengthen the port\u2019s role as a key container hub in the North Adriatic.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>TRIESTE \u2013 This week, construction will begin at the Port of Koper on the northern extension of Pier I, starting with the installation of the first steel piles.<\/p>\n","protected":false},"author":2,"featured_media":34440,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[25,26],"tags":[],"class_list":["post-34447","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-logistics","category-shipping-en","et-has-post-format-content","et_post_format-et-post-format-standard"],"yoast_head":"\n<title>Koper, piling works begin for Pier I expansion - AdriaPorts<\/title>\n<meta name=\"description\" content=\"Planned 326 meters of new quay and 7 hectares of yard space: container capacity to reach 1.8 million TEUs by 2027\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.adriaports.com\/en\/logistics\/koper-piling-works-begin-for-pier-i-expansion\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Koper, piling works begin for Pier I expansion - AdriaPorts\" \/>\n<meta property=\"og:description\" content=\"Planned 326 meters of new quay and 7 hectares of yard space: container capacity to reach 1.8 million TEUs by 2027\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.adriaports.com\/en\/logistics\/koper-piling-works-begin-for-pier-i-expansion\/\" \/>\n<meta property=\"og:site_name\" content=\"AdriaPorts\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/AdriaPortsShipping\" \/>\n<meta property=\"article:published_time\" content=\"2025-07-08T17:13:18+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-07-13T15:35:57+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.adriaports.com\/wp-content\/uploads\/2025\/07\/Lavori-Molo-I-a-8-7-2025.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2048\" \/>\n\t<meta property=\"og:image:height\" content=\"1259\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Riccardo Coretti\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Riccardo Coretti\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/logistics\\\/koper-piling-works-begin-for-pier-i-expansion\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/logistics\\\/koper-piling-works-begin-for-pier-i-expansion\\\/\"},\"author\":{\"name\":\"Riccardo Coretti\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#\\\/schema\\\/person\\\/e1f4a3e4ab6a5399d77daa3fcfd7e9a4\"},\"headline\":\"Koper, piling works begin for Pier I expansion\",\"datePublished\":\"2025-07-08T17:13:18+00:00\",\"dateModified\":\"2025-07-13T15:35:57+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/logistics\\\/koper-piling-works-begin-for-pier-i-expansion\\\/\"},\"wordCount\":331,\"publisher\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/logistics\\\/koper-piling-works-begin-for-pier-i-expansion\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.adriaports.com\\\/wp-content\\\/uploads\\\/2025\\\/07\\\/Lavori-Molo-I-a-8-7-2025.jpg\",\"articleSection\":[\"Logistics\",\"Shipping\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/logistics\\\/koper-piling-works-begin-for-pier-i-expansion\\\/\",\"url\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/logistics\\\/koper-piling-works-begin-for-pier-i-expansion\\\/\",\"name\":\"Koper, piling works begin for Pier I expansion - AdriaPorts\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/logistics\\\/koper-piling-works-begin-for-pier-i-expansion\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/logistics\\\/koper-piling-works-begin-for-pier-i-expansion\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.adriaports.com\\\/wp-content\\\/uploads\\\/2025\\\/07\\\/Lavori-Molo-I-a-8-7-2025.jpg\",\"datePublished\":\"2025-07-08T17:13:18+00:00\",\"dateModified\":\"2025-07-13T15:35:57+00:00\",\"description\":\"Planned 326 meters of new quay and 7 hectares of yard space: container capacity to reach 1.8 million TEUs by 2027\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/logistics\\\/koper-piling-works-begin-for-pier-i-expansion\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.adriaports.com\\\/en\\\/logistics\\\/koper-piling-works-begin-for-pier-i-expansion\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/logistics\\\/koper-piling-works-begin-for-pier-i-expansion\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.adriaports.com\\\/wp-content\\\/uploads\\\/2025\\\/07\\\/Lavori-Molo-I-a-8-7-2025.jpg\",\"contentUrl\":\"https:\\\/\\\/www.adriaports.com\\\/wp-content\\\/uploads\\\/2025\\\/07\\\/Lavori-Molo-I-a-8-7-2025.jpg\",\"width\":2048,\"height\":1259,\"caption\":\"The stretch of water that will be affected by the container terminal expansion.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/logistics\\\/koper-piling-works-begin-for-pier-i-expansion\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Koper, piling works begin for Pier I expansion\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/\",\"name\":\"AdriaPorts\",\"description\":\"AdriaPorts \u00e8 la principale fonte di notizie su Porti, Logistica, Ferrovie e Cantieri Navali del Nord Adriatico\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#organization\",\"name\":\"AdriaPorts\",\"url\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.adriaports.com\\\/wp-content\\\/uploads\\\/2021\\\/06\\\/logo.svg\",\"contentUrl\":\"https:\\\/\\\/www.adriaports.com\\\/wp-content\\\/uploads\\\/2021\\\/06\\\/logo.svg\",\"width\":678,\"height\":119,\"caption\":\"AdriaPorts\"},\"image\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/AdriaPortsShipping\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/adriaports\\\/\",\"https:\\\/\\\/t.me\\\/adriaports\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#\\\/schema\\\/person\\\/e1f4a3e4ab6a5399d77daa3fcfd7e9a4\",\"name\":\"Riccardo Coretti\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/af80fe5463f86bb046a71d217f7b5541ae6893d2ac1f5850b850a97dfaaf061e?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/af80fe5463f86bb046a71d217f7b5541ae6893d2ac1f5850b850a97dfaaf061e?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/af80fe5463f86bb046a71d217f7b5541ae6893d2ac1f5850b850a97dfaaf061e?s=96&d=mm&r=g\",\"caption\":\"Riccardo Coretti\"},\"url\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/author\\\/riccardo\\\/\"}]}<\/script>\n","yoast_head_json":{"title":"Koper, piling works begin for Pier I expansion - AdriaPorts","description":"Planned 326 meters of new quay and 7 hectares of yard space: container capacity to reach 1.8 million TEUs by 2027","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.adriaports.com\/en\/logistics\/koper-piling-works-begin-for-pier-i-expansion\/","og_locale":"en_US","og_type":"article","og_title":"Koper, piling works begin for Pier I expansion - AdriaPorts","og_description":"Planned 326 meters of new quay and 7 hectares of yard space: container capacity to reach 1.8 million TEUs by 2027","og_url":"https:\/\/www.adriaports.com\/en\/logistics\/koper-piling-works-begin-for-pier-i-expansion\/","og_site_name":"AdriaPorts","article_publisher":"https:\/\/www.facebook.com\/AdriaPortsShipping","article_published_time":"2025-07-08T17:13:18+00:00","article_modified_time":"2025-07-13T15:35:57+00:00","og_image":[{"width":2048,"height":1259,"url":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2025\/07\/Lavori-Molo-I-a-8-7-2025.jpg","type":"image\/jpeg"}],"author":"Riccardo Coretti","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Riccardo Coretti","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.adriaports.com\/en\/logistics\/koper-piling-works-begin-for-pier-i-expansion\/#article","isPartOf":{"@id":"https:\/\/www.adriaports.com\/en\/logistics\/koper-piling-works-begin-for-pier-i-expansion\/"},"author":{"name":"Riccardo Coretti","@id":"https:\/\/www.adriaports.com\/en\/#\/schema\/person\/e1f4a3e4ab6a5399d77daa3fcfd7e9a4"},"headline":"Koper, piling works begin for Pier I expansion","datePublished":"2025-07-08T17:13:18+00:00","dateModified":"2025-07-13T15:35:57+00:00","mainEntityOfPage":{"@id":"https:\/\/www.adriaports.com\/en\/logistics\/koper-piling-works-begin-for-pier-i-expansion\/"},"wordCount":331,"publisher":{"@id":"https:\/\/www.adriaports.com\/en\/#organization"},"image":{"@id":"https:\/\/www.adriaports.com\/en\/logistics\/koper-piling-works-begin-for-pier-i-expansion\/#primaryimage"},"thumbnailUrl":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2025\/07\/Lavori-Molo-I-a-8-7-2025.jpg","articleSection":["Logistics","Shipping"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.adriaports.com\/en\/logistics\/koper-piling-works-begin-for-pier-i-expansion\/","url":"https:\/\/www.adriaports.com\/en\/logistics\/koper-piling-works-begin-for-pier-i-expansion\/","name":"Koper, piling works begin for Pier I expansion - AdriaPorts","isPartOf":{"@id":"https:\/\/www.adriaports.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.adriaports.com\/en\/logistics\/koper-piling-works-begin-for-pier-i-expansion\/#primaryimage"},"image":{"@id":"https:\/\/www.adriaports.com\/en\/logistics\/koper-piling-works-begin-for-pier-i-expansion\/#primaryimage"},"thumbnailUrl":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2025\/07\/Lavori-Molo-I-a-8-7-2025.jpg","datePublished":"2025-07-08T17:13:18+00:00","dateModified":"2025-07-13T15:35:57+00:00","description":"Planned 326 meters of new quay and 7 hectares of yard space: container capacity to reach 1.8 million TEUs by 2027","breadcrumb":{"@id":"https:\/\/www.adriaports.com\/en\/logistics\/koper-piling-works-begin-for-pier-i-expansion\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.adriaports.com\/en\/logistics\/koper-piling-works-begin-for-pier-i-expansion\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.adriaports.com\/en\/logistics\/koper-piling-works-begin-for-pier-i-expansion\/#primaryimage","url":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2025\/07\/Lavori-Molo-I-a-8-7-2025.jpg","contentUrl":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2025\/07\/Lavori-Molo-I-a-8-7-2025.jpg","width":2048,"height":1259,"caption":"The stretch of water that will be affected by the container terminal expansion."},{"@type":"BreadcrumbList","@id":"https:\/\/www.adriaports.com\/en\/logistics\/koper-piling-works-begin-for-pier-i-expansion\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.adriaports.com\/en\/"},{"@type":"ListItem","position":2,"name":"Koper, piling works begin for Pier I expansion"}]},{"@type":"WebSite","@id":"https:\/\/www.adriaports.com\/en\/#website","url":"https:\/\/www.adriaports.com\/en\/","name":"AdriaPorts","description":"AdriaPorts \u00e8 la principale fonte di notizie su Porti, Logistica, Ferrovie e Cantieri Navali del Nord Adriatico","publisher":{"@id":"https:\/\/www.adriaports.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.adriaports.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.adriaports.com\/en\/#organization","name":"AdriaPorts","url":"https:\/\/www.adriaports.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.adriaports.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2021\/06\/logo.svg","contentUrl":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2021\/06\/logo.svg","width":678,"height":119,"caption":"AdriaPorts"},"image":{"@id":"https:\/\/www.adriaports.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/AdriaPortsShipping","https:\/\/www.linkedin.com\/company\/adriaports\/","https:\/\/t.me\/adriaports"]},{"@type":"Person","@id":"https:\/\/www.adriaports.com\/en\/#\/schema\/person\/e1f4a3e4ab6a5399d77daa3fcfd7e9a4","name":"Riccardo Coretti","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/af80fe5463f86bb046a71d217f7b5541ae6893d2ac1f5850b850a97dfaaf061e?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/af80fe5463f86bb046a71d217f7b5541ae6893d2ac1f5850b850a97dfaaf061e?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/af80fe5463f86bb046a71d217f7b5541ae6893d2ac1f5850b850a97dfaaf061e?s=96&d=mm&r=g","caption":"Riccardo Coretti"},"url":"https:\/\/www.adriaports.com\/en\/author\/riccardo\/"}]}},"_links":{"self":[{"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/posts\/34447","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/comments?post=34447"}],"version-history":[{"count":1,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/posts\/34447\/revisions"}],"predecessor-version":[{"id":34448,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/posts\/34447\/revisions\/34448"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/media\/34440"}],"wp:attachment":[{"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/media?parent=34447"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/categories?post=34447"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/tags?post=34447"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}