{"id":35473,"date":"2025-10-03T22:13:21","date_gmt":"2025-10-03T20:13:21","guid":{"rendered":"https:\/\/www.adriaports.com\/uncategorized\/autostrade-alto-adriatico-to-launch-nine-post-summer-construction-sites\/"},"modified":"2025-10-06T21:54:22","modified_gmt":"2025-10-06T19:54:22","slug":"autostrade-alto-adriatico-to-launch-nine-post-summer-construction-sites","status":"publish","type":"post","link":"https:\/\/www.adriaports.com\/en\/logistics\/autostrade-alto-adriatico-to-launch-nine-post-summer-construction-sites\/","title":{"rendered":"Autostrade Alto Adriatico to launch nine post-summer construction sites"},"content":{"rendered":"<p><strong>TRIESTE \u2013<\/strong> Following the end of the summer travel season, which saw record traffic volumes across the motorway network <strong>(+8% in June and +4% between July and September, for a total of nearly 21 million vehicles)<\/strong>, Autostrade Alto Adriatico has resumed maintenance work.<\/p>\n<p>For the autumn period, <strong>nine construction sites are planned, with an investment of \u20ac900,000, to resurface 57,664 square meters of carriageways.<\/strong> The works involve sections of the A4 motorway between Meolo\u2013Venezia Est (toward Venice), Quarto d\u2019Altino\u2013Meolo (toward Trieste), Meolo\u2013San Don\u00e0 di Piave (toward Trieste), Portogruaro\u2013San Stino di Livenza (toward Venice) and the Latisana link road. On the A28, interventions will cover the Pordenone Centro Commerciale\u2013Cimpello section (toward Portogruaro), the Portogruaro toll plaza (toward Conegliano), and the Sacile Ovest\u2013Sacile Est and Godega di Sant\u2019Urbano\u2013Cordignano stretches (both toward Portogruaro).<\/p>\n<p><strong>Work began last weekend with the first two sites on the A4<\/strong>, between Meolo and Venezia Est and between Quarto d\u2019Altino and Meolo, completed in five nights without significant traffic disruption. More challenging will be the 2.2-kilometer site on the three-lane A4 section between Meolo\/Roncade and San Don\u00e0 di Piave, heading toward Trieste. To allow for full pavement renewal, <strong>work will continue around the clock, day and night,<\/strong> with lane shifts between 11 p.m. on Saturday, October 4 and 4 a.m. on Thursday, October 9. Two lanes in each direction will remain open, with a dedicated exit lane at Meolo for traffic coming from Trieste.<\/p>\n<p>Starting October 6, work will also resume on <strong>upgrading the central reservation between Redipuglia and the Trieste\/Lisert toll barrier,<\/strong> which was suspended during the summer to ease traffic and mitigate the impact of the closure of Slovenia\u2019s H4 expressway. The total investment for this project amounts to \u20ac8.3 million, including \u20ac6.8 million in works, over a 4.2-kilometer stretch. Throughout the project, carriageways will be reduced from 7.5 to 6.4 meters, but two lanes in each direction will remain open to minimize traffic disruption.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>TRIESTE \u2013 Following the end of the summer travel season, which saw record traffic volumes across the motorway network (+8% in June and +4% between July and September, for a total of nearly 21 million vehicles), Autostrade Alto Adriatico has resumed maintenance work.<\/p>\n","protected":false},"author":2,"featured_media":26232,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[25],"tags":[],"class_list":["post-35473","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-logistics","et-has-post-format-content","et_post_format-et-post-format-standard"],"yoast_head":"\n<title>Autostrade Alto Adriatico to launch nine post-summer construction sites - AdriaPorts<\/title>\n<meta name=\"description\" content=\"Investments of \u20ac900,000 planned for resurfacing more than 57,000 square meters of carriageway\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.adriaports.com\/en\/logistics\/autostrade-alto-adriatico-to-launch-nine-post-summer-construction-sites\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Autostrade Alto Adriatico to launch nine post-summer construction sites - AdriaPorts\" \/>\n<meta property=\"og:description\" content=\"Investments of \u20ac900,000 planned for resurfacing more than 57,000 square meters of carriageway\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.adriaports.com\/en\/logistics\/autostrade-alto-adriatico-to-launch-nine-post-summer-construction-sites\/\" \/>\n<meta property=\"og:site_name\" content=\"AdriaPorts\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/AdriaPortsShipping\" \/>\n<meta property=\"article:published_time\" content=\"2025-10-03T20:13:21+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-10-06T19:54:22+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.adriaports.com\/wp-content\/uploads\/2023\/06\/Camion-A4.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2048\" \/>\n\t<meta property=\"og:image:height\" content=\"1105\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Riccardo Coretti\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Riccardo Coretti\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/logistics\\\/autostrade-alto-adriatico-to-launch-nine-post-summer-construction-sites\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/logistics\\\/autostrade-alto-adriatico-to-launch-nine-post-summer-construction-sites\\\/\"},\"author\":{\"name\":\"Riccardo Coretti\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#\\\/schema\\\/person\\\/e1f4a3e4ab6a5399d77daa3fcfd7e9a4\"},\"headline\":\"Autostrade Alto Adriatico to launch nine post-summer construction sites\",\"datePublished\":\"2025-10-03T20:13:21+00:00\",\"dateModified\":\"2025-10-06T19:54:22+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/logistics\\\/autostrade-alto-adriatico-to-launch-nine-post-summer-construction-sites\\\/\"},\"wordCount\":327,\"publisher\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/logistics\\\/autostrade-alto-adriatico-to-launch-nine-post-summer-construction-sites\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.adriaports.com\\\/wp-content\\\/uploads\\\/2023\\\/06\\\/Camion-A4.jpg\",\"articleSection\":[\"Logistics\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/logistics\\\/autostrade-alto-adriatico-to-launch-nine-post-summer-construction-sites\\\/\",\"url\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/logistics\\\/autostrade-alto-adriatico-to-launch-nine-post-summer-construction-sites\\\/\",\"name\":\"Autostrade Alto Adriatico to launch nine post-summer construction sites - AdriaPorts\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/logistics\\\/autostrade-alto-adriatico-to-launch-nine-post-summer-construction-sites\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/logistics\\\/autostrade-alto-adriatico-to-launch-nine-post-summer-construction-sites\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.adriaports.com\\\/wp-content\\\/uploads\\\/2023\\\/06\\\/Camion-A4.jpg\",\"datePublished\":\"2025-10-03T20:13:21+00:00\",\"dateModified\":\"2025-10-06T19:54:22+00:00\",\"description\":\"Investments of \u20ac900,000 planned for resurfacing more than 57,000 square meters of carriageway\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/logistics\\\/autostrade-alto-adriatico-to-launch-nine-post-summer-construction-sites\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.adriaports.com\\\/en\\\/logistics\\\/autostrade-alto-adriatico-to-launch-nine-post-summer-construction-sites\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/logistics\\\/autostrade-alto-adriatico-to-launch-nine-post-summer-construction-sites\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.adriaports.com\\\/wp-content\\\/uploads\\\/2023\\\/06\\\/Camion-A4.jpg\",\"contentUrl\":\"https:\\\/\\\/www.adriaports.com\\\/wp-content\\\/uploads\\\/2023\\\/06\\\/Camion-A4.jpg\",\"width\":2048,\"height\":1105,\"caption\":\"Trucks along the A4 in Friuli Venezia Giulia.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/logistics\\\/autostrade-alto-adriatico-to-launch-nine-post-summer-construction-sites\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Autostrade Alto Adriatico to launch nine post-summer construction sites\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/\",\"name\":\"AdriaPorts\",\"description\":\"AdriaPorts \u00e8 la principale fonte di notizie su Porti, Logistica, Ferrovie e Cantieri Navali del Nord Adriatico\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#organization\",\"name\":\"AdriaPorts\",\"url\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.adriaports.com\\\/wp-content\\\/uploads\\\/2021\\\/06\\\/logo.svg\",\"contentUrl\":\"https:\\\/\\\/www.adriaports.com\\\/wp-content\\\/uploads\\\/2021\\\/06\\\/logo.svg\",\"width\":678,\"height\":119,\"caption\":\"AdriaPorts\"},\"image\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/AdriaPortsShipping\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/adriaports\\\/\",\"https:\\\/\\\/t.me\\\/adriaports\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#\\\/schema\\\/person\\\/e1f4a3e4ab6a5399d77daa3fcfd7e9a4\",\"name\":\"Riccardo Coretti\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/af80fe5463f86bb046a71d217f7b5541ae6893d2ac1f5850b850a97dfaaf061e?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/af80fe5463f86bb046a71d217f7b5541ae6893d2ac1f5850b850a97dfaaf061e?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/af80fe5463f86bb046a71d217f7b5541ae6893d2ac1f5850b850a97dfaaf061e?s=96&d=mm&r=g\",\"caption\":\"Riccardo Coretti\"},\"url\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/author\\\/riccardo\\\/\"}]}<\/script>\n","yoast_head_json":{"title":"Autostrade Alto Adriatico to launch nine post-summer construction sites - AdriaPorts","description":"Investments of \u20ac900,000 planned for resurfacing more than 57,000 square meters of carriageway","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.adriaports.com\/en\/logistics\/autostrade-alto-adriatico-to-launch-nine-post-summer-construction-sites\/","og_locale":"en_US","og_type":"article","og_title":"Autostrade Alto Adriatico to launch nine post-summer construction sites - AdriaPorts","og_description":"Investments of \u20ac900,000 planned for resurfacing more than 57,000 square meters of carriageway","og_url":"https:\/\/www.adriaports.com\/en\/logistics\/autostrade-alto-adriatico-to-launch-nine-post-summer-construction-sites\/","og_site_name":"AdriaPorts","article_publisher":"https:\/\/www.facebook.com\/AdriaPortsShipping","article_published_time":"2025-10-03T20:13:21+00:00","article_modified_time":"2025-10-06T19:54:22+00:00","og_image":[{"width":2048,"height":1105,"url":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2023\/06\/Camion-A4.jpg","type":"image\/jpeg"}],"author":"Riccardo Coretti","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Riccardo Coretti","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.adriaports.com\/en\/logistics\/autostrade-alto-adriatico-to-launch-nine-post-summer-construction-sites\/#article","isPartOf":{"@id":"https:\/\/www.adriaports.com\/en\/logistics\/autostrade-alto-adriatico-to-launch-nine-post-summer-construction-sites\/"},"author":{"name":"Riccardo Coretti","@id":"https:\/\/www.adriaports.com\/en\/#\/schema\/person\/e1f4a3e4ab6a5399d77daa3fcfd7e9a4"},"headline":"Autostrade Alto Adriatico to launch nine post-summer construction sites","datePublished":"2025-10-03T20:13:21+00:00","dateModified":"2025-10-06T19:54:22+00:00","mainEntityOfPage":{"@id":"https:\/\/www.adriaports.com\/en\/logistics\/autostrade-alto-adriatico-to-launch-nine-post-summer-construction-sites\/"},"wordCount":327,"publisher":{"@id":"https:\/\/www.adriaports.com\/en\/#organization"},"image":{"@id":"https:\/\/www.adriaports.com\/en\/logistics\/autostrade-alto-adriatico-to-launch-nine-post-summer-construction-sites\/#primaryimage"},"thumbnailUrl":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2023\/06\/Camion-A4.jpg","articleSection":["Logistics"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.adriaports.com\/en\/logistics\/autostrade-alto-adriatico-to-launch-nine-post-summer-construction-sites\/","url":"https:\/\/www.adriaports.com\/en\/logistics\/autostrade-alto-adriatico-to-launch-nine-post-summer-construction-sites\/","name":"Autostrade Alto Adriatico to launch nine post-summer construction sites - AdriaPorts","isPartOf":{"@id":"https:\/\/www.adriaports.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.adriaports.com\/en\/logistics\/autostrade-alto-adriatico-to-launch-nine-post-summer-construction-sites\/#primaryimage"},"image":{"@id":"https:\/\/www.adriaports.com\/en\/logistics\/autostrade-alto-adriatico-to-launch-nine-post-summer-construction-sites\/#primaryimage"},"thumbnailUrl":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2023\/06\/Camion-A4.jpg","datePublished":"2025-10-03T20:13:21+00:00","dateModified":"2025-10-06T19:54:22+00:00","description":"Investments of \u20ac900,000 planned for resurfacing more than 57,000 square meters of carriageway","breadcrumb":{"@id":"https:\/\/www.adriaports.com\/en\/logistics\/autostrade-alto-adriatico-to-launch-nine-post-summer-construction-sites\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.adriaports.com\/en\/logistics\/autostrade-alto-adriatico-to-launch-nine-post-summer-construction-sites\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.adriaports.com\/en\/logistics\/autostrade-alto-adriatico-to-launch-nine-post-summer-construction-sites\/#primaryimage","url":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2023\/06\/Camion-A4.jpg","contentUrl":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2023\/06\/Camion-A4.jpg","width":2048,"height":1105,"caption":"Trucks along the A4 in Friuli Venezia Giulia."},{"@type":"BreadcrumbList","@id":"https:\/\/www.adriaports.com\/en\/logistics\/autostrade-alto-adriatico-to-launch-nine-post-summer-construction-sites\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.adriaports.com\/en\/"},{"@type":"ListItem","position":2,"name":"Autostrade Alto Adriatico to launch nine post-summer construction sites"}]},{"@type":"WebSite","@id":"https:\/\/www.adriaports.com\/en\/#website","url":"https:\/\/www.adriaports.com\/en\/","name":"AdriaPorts","description":"AdriaPorts \u00e8 la principale fonte di notizie su Porti, Logistica, Ferrovie e Cantieri Navali del Nord Adriatico","publisher":{"@id":"https:\/\/www.adriaports.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.adriaports.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.adriaports.com\/en\/#organization","name":"AdriaPorts","url":"https:\/\/www.adriaports.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.adriaports.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2021\/06\/logo.svg","contentUrl":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2021\/06\/logo.svg","width":678,"height":119,"caption":"AdriaPorts"},"image":{"@id":"https:\/\/www.adriaports.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/AdriaPortsShipping","https:\/\/www.linkedin.com\/company\/adriaports\/","https:\/\/t.me\/adriaports"]},{"@type":"Person","@id":"https:\/\/www.adriaports.com\/en\/#\/schema\/person\/e1f4a3e4ab6a5399d77daa3fcfd7e9a4","name":"Riccardo Coretti","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/af80fe5463f86bb046a71d217f7b5541ae6893d2ac1f5850b850a97dfaaf061e?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/af80fe5463f86bb046a71d217f7b5541ae6893d2ac1f5850b850a97dfaaf061e?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/af80fe5463f86bb046a71d217f7b5541ae6893d2ac1f5850b850a97dfaaf061e?s=96&d=mm&r=g","caption":"Riccardo Coretti"},"url":"https:\/\/www.adriaports.com\/en\/author\/riccardo\/"}]}},"_links":{"self":[{"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/posts\/35473","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/comments?post=35473"}],"version-history":[{"count":1,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/posts\/35473\/revisions"}],"predecessor-version":[{"id":35474,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/posts\/35473\/revisions\/35474"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/media\/26232"}],"wp:attachment":[{"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/media?parent=35473"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/categories?post=35473"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/tags?post=35473"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}