{"id":36044,"date":"2025-11-18T23:57:55","date_gmt":"2025-11-18T22:57:55","guid":{"rendered":"https:\/\/www.adriaports.com\/uncategorized\/koper-divaca-railway-tracks-laid-along-half-the-route\/"},"modified":"2025-11-24T19:58:27","modified_gmt":"2025-11-24T18:58:27","slug":"koper-divaca-railway-tracks-laid-along-half-the-route","status":"publish","type":"post","link":"https:\/\/www.adriaports.com\/en\/railways\/koper-divaca-railway-tracks-laid-along-half-the-route\/","title":{"rendered":"Koper\u2013Diva\u010da railway: tracks laid along half the route"},"content":{"rendered":"<p><strong>TRIESTE &#8211;<\/strong> On the new railway line between Koper and <span class=\"cf0\">Diva\u010da<\/span>, <strong>13,656 metres of track have been laid \u2014 meaning that half of the 27.1-kilometre route<\/strong> is now equipped with the infrastructure needed for its use.<\/p>\n<p>Track installation is currently underway in two sections: in the line\u2019s longest tunnel, the <span class=\"cf0\">Lokev<\/span> tunnel (T1), and in the <span class=\"cf0\">Tinjan<\/span> tunnel (T4). Track has already been laid in the <span class=\"cf1\">\u0160kofije<\/span> (T8), <span class=\"cf1\">Mlinarji<\/span> (T7), <span class=\"cf1\">Osp<\/span> (T5\u20136) and <span class=\"cf1\">Stepani<\/span> (T3) tunnels, as well as on the <span class=\"cf0\">Gabrovica<\/span> and <span class=\"cf0\">Vinjan<\/span> viaducts. <strong>A rigid-base track system is used inside tunnels and on viaducts, while a small section of open line uses traditional ballast track.<\/strong><\/p>\n<p>In the coming months, works will focus mainly on <strong>completing track-laying on the remaining sections and installing technical systems<\/strong>, including line electrification, tunnel power-supply equipment (transformer-station systems and power cables), signalling, safety and telecommunications devices, an emergency-lighting system inside tunnels, a safety and video-surveillance system, and remote-control equipment. Progress in track laying <strong>could allow the entire line to be open to rail traffic<\/strong> <strong><span class=\"cf1\">by March 2026.<\/span><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>TRIESTE &#8211; On the new railway line between Koper and Diva\u010da, 13,656 metres of track have been laid \u2014 meaning that half of the 27.1-kilometre route is now equipped with the infrastructure needed for its use.<\/p>\n","protected":false},"author":2,"featured_media":35975,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[25,37],"tags":[],"class_list":["post-36044","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-logistics","category-railways","et-has-post-format-content","et_post_format-et-post-format-standard"],"yoast_head":"\n<title>Koper\u2013Diva\u010da railway: tracks laid along half the route - AdriaPorts<\/title>\n<meta name=\"description\" content=\"Full-speed progress on the new line serving the Slovenian port, with major work underway on technological systems\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.adriaports.com\/en\/railways\/koper-divaca-railway-tracks-laid-along-half-the-route\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Koper\u2013Diva\u010da railway: tracks laid along half the route - AdriaPorts\" \/>\n<meta property=\"og:description\" content=\"Full-speed progress on the new line serving the Slovenian port, with major work underway on technological systems\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.adriaports.com\/en\/railways\/koper-divaca-railway-tracks-laid-along-half-the-route\/\" \/>\n<meta property=\"og:site_name\" content=\"AdriaPorts\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/AdriaPortsShipping\" \/>\n<meta property=\"article:published_time\" content=\"2025-11-18T22:57:55+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-11-24T18:58:27+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.adriaports.com\/wp-content\/uploads\/2025\/11\/Kp-Divaccia-11-2025.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1536\" \/>\n\t<meta property=\"og:image:height\" content=\"854\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Riccardo Coretti\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Riccardo Coretti\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/koper-divaca-railway-tracks-laid-along-half-the-route\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/koper-divaca-railway-tracks-laid-along-half-the-route\\\/\"},\"author\":{\"name\":\"Riccardo Coretti\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#\\\/schema\\\/person\\\/e1f4a3e4ab6a5399d77daa3fcfd7e9a4\"},\"headline\":\"Koper\u2013Diva\u010da railway: tracks laid along half the route\",\"datePublished\":\"2025-11-18T22:57:55+00:00\",\"dateModified\":\"2025-11-24T18:58:27+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/koper-divaca-railway-tracks-laid-along-half-the-route\\\/\"},\"wordCount\":182,\"publisher\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/koper-divaca-railway-tracks-laid-along-half-the-route\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.adriaports.com\\\/wp-content\\\/uploads\\\/2025\\\/11\\\/Kp-Divaccia-11-2025.jpg\",\"articleSection\":[\"Logistics\",\"Railways\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/koper-divaca-railway-tracks-laid-along-half-the-route\\\/\",\"url\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/koper-divaca-railway-tracks-laid-along-half-the-route\\\/\",\"name\":\"Koper\u2013Diva\u010da railway: tracks laid along half the route - AdriaPorts\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/koper-divaca-railway-tracks-laid-along-half-the-route\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/koper-divaca-railway-tracks-laid-along-half-the-route\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.adriaports.com\\\/wp-content\\\/uploads\\\/2025\\\/11\\\/Kp-Divaccia-11-2025.jpg\",\"datePublished\":\"2025-11-18T22:57:55+00:00\",\"dateModified\":\"2025-11-24T18:58:27+00:00\",\"description\":\"Full-speed progress on the new line serving the Slovenian port, with major work underway on technological systems\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/koper-divaca-railway-tracks-laid-along-half-the-route\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/koper-divaca-railway-tracks-laid-along-half-the-route\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/koper-divaca-railway-tracks-laid-along-half-the-route\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.adriaports.com\\\/wp-content\\\/uploads\\\/2025\\\/11\\\/Kp-Divaccia-11-2025.jpg\",\"contentUrl\":\"https:\\\/\\\/www.adriaports.com\\\/wp-content\\\/uploads\\\/2025\\\/11\\\/Kp-Divaccia-11-2025.jpg\",\"width\":1536,\"height\":854,\"caption\":\"Track-laying works on the new Koper\u2013Diva\u010da section.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/koper-divaca-railway-tracks-laid-along-half-the-route\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Koper\u2013Diva\u010da railway: tracks laid along half the route\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/\",\"name\":\"AdriaPorts\",\"description\":\"AdriaPorts \u00e8 la principale fonte di notizie su Porti, Logistica, Ferrovie e Cantieri Navali del Nord Adriatico\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#organization\",\"name\":\"AdriaPorts\",\"url\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.adriaports.com\\\/wp-content\\\/uploads\\\/2021\\\/06\\\/logo.svg\",\"contentUrl\":\"https:\\\/\\\/www.adriaports.com\\\/wp-content\\\/uploads\\\/2021\\\/06\\\/logo.svg\",\"width\":678,\"height\":119,\"caption\":\"AdriaPorts\"},\"image\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/AdriaPortsShipping\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/adriaports\\\/\",\"https:\\\/\\\/t.me\\\/adriaports\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#\\\/schema\\\/person\\\/e1f4a3e4ab6a5399d77daa3fcfd7e9a4\",\"name\":\"Riccardo Coretti\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/af80fe5463f86bb046a71d217f7b5541ae6893d2ac1f5850b850a97dfaaf061e?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/af80fe5463f86bb046a71d217f7b5541ae6893d2ac1f5850b850a97dfaaf061e?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/af80fe5463f86bb046a71d217f7b5541ae6893d2ac1f5850b850a97dfaaf061e?s=96&d=mm&r=g\",\"caption\":\"Riccardo Coretti\"},\"url\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/author\\\/riccardo\\\/\"}]}<\/script>\n","yoast_head_json":{"title":"Koper\u2013Diva\u010da railway: tracks laid along half the route - AdriaPorts","description":"Full-speed progress on the new line serving the Slovenian port, with major work underway on technological systems","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.adriaports.com\/en\/railways\/koper-divaca-railway-tracks-laid-along-half-the-route\/","og_locale":"en_US","og_type":"article","og_title":"Koper\u2013Diva\u010da railway: tracks laid along half the route - AdriaPorts","og_description":"Full-speed progress on the new line serving the Slovenian port, with major work underway on technological systems","og_url":"https:\/\/www.adriaports.com\/en\/railways\/koper-divaca-railway-tracks-laid-along-half-the-route\/","og_site_name":"AdriaPorts","article_publisher":"https:\/\/www.facebook.com\/AdriaPortsShipping","article_published_time":"2025-11-18T22:57:55+00:00","article_modified_time":"2025-11-24T18:58:27+00:00","og_image":[{"width":1536,"height":854,"url":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2025\/11\/Kp-Divaccia-11-2025.jpg","type":"image\/jpeg"}],"author":"Riccardo Coretti","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Riccardo Coretti","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.adriaports.com\/en\/railways\/koper-divaca-railway-tracks-laid-along-half-the-route\/#article","isPartOf":{"@id":"https:\/\/www.adriaports.com\/en\/railways\/koper-divaca-railway-tracks-laid-along-half-the-route\/"},"author":{"name":"Riccardo Coretti","@id":"https:\/\/www.adriaports.com\/en\/#\/schema\/person\/e1f4a3e4ab6a5399d77daa3fcfd7e9a4"},"headline":"Koper\u2013Diva\u010da railway: tracks laid along half the route","datePublished":"2025-11-18T22:57:55+00:00","dateModified":"2025-11-24T18:58:27+00:00","mainEntityOfPage":{"@id":"https:\/\/www.adriaports.com\/en\/railways\/koper-divaca-railway-tracks-laid-along-half-the-route\/"},"wordCount":182,"publisher":{"@id":"https:\/\/www.adriaports.com\/en\/#organization"},"image":{"@id":"https:\/\/www.adriaports.com\/en\/railways\/koper-divaca-railway-tracks-laid-along-half-the-route\/#primaryimage"},"thumbnailUrl":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2025\/11\/Kp-Divaccia-11-2025.jpg","articleSection":["Logistics","Railways"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.adriaports.com\/en\/railways\/koper-divaca-railway-tracks-laid-along-half-the-route\/","url":"https:\/\/www.adriaports.com\/en\/railways\/koper-divaca-railway-tracks-laid-along-half-the-route\/","name":"Koper\u2013Diva\u010da railway: tracks laid along half the route - AdriaPorts","isPartOf":{"@id":"https:\/\/www.adriaports.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.adriaports.com\/en\/railways\/koper-divaca-railway-tracks-laid-along-half-the-route\/#primaryimage"},"image":{"@id":"https:\/\/www.adriaports.com\/en\/railways\/koper-divaca-railway-tracks-laid-along-half-the-route\/#primaryimage"},"thumbnailUrl":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2025\/11\/Kp-Divaccia-11-2025.jpg","datePublished":"2025-11-18T22:57:55+00:00","dateModified":"2025-11-24T18:58:27+00:00","description":"Full-speed progress on the new line serving the Slovenian port, with major work underway on technological systems","breadcrumb":{"@id":"https:\/\/www.adriaports.com\/en\/railways\/koper-divaca-railway-tracks-laid-along-half-the-route\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.adriaports.com\/en\/railways\/koper-divaca-railway-tracks-laid-along-half-the-route\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.adriaports.com\/en\/railways\/koper-divaca-railway-tracks-laid-along-half-the-route\/#primaryimage","url":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2025\/11\/Kp-Divaccia-11-2025.jpg","contentUrl":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2025\/11\/Kp-Divaccia-11-2025.jpg","width":1536,"height":854,"caption":"Track-laying works on the new Koper\u2013Diva\u010da section."},{"@type":"BreadcrumbList","@id":"https:\/\/www.adriaports.com\/en\/railways\/koper-divaca-railway-tracks-laid-along-half-the-route\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.adriaports.com\/en\/"},{"@type":"ListItem","position":2,"name":"Koper\u2013Diva\u010da railway: tracks laid along half the route"}]},{"@type":"WebSite","@id":"https:\/\/www.adriaports.com\/en\/#website","url":"https:\/\/www.adriaports.com\/en\/","name":"AdriaPorts","description":"AdriaPorts \u00e8 la principale fonte di notizie su Porti, Logistica, Ferrovie e Cantieri Navali del Nord Adriatico","publisher":{"@id":"https:\/\/www.adriaports.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.adriaports.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.adriaports.com\/en\/#organization","name":"AdriaPorts","url":"https:\/\/www.adriaports.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.adriaports.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2021\/06\/logo.svg","contentUrl":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2021\/06\/logo.svg","width":678,"height":119,"caption":"AdriaPorts"},"image":{"@id":"https:\/\/www.adriaports.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/AdriaPortsShipping","https:\/\/www.linkedin.com\/company\/adriaports\/","https:\/\/t.me\/adriaports"]},{"@type":"Person","@id":"https:\/\/www.adriaports.com\/en\/#\/schema\/person\/e1f4a3e4ab6a5399d77daa3fcfd7e9a4","name":"Riccardo Coretti","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/af80fe5463f86bb046a71d217f7b5541ae6893d2ac1f5850b850a97dfaaf061e?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/af80fe5463f86bb046a71d217f7b5541ae6893d2ac1f5850b850a97dfaaf061e?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/af80fe5463f86bb046a71d217f7b5541ae6893d2ac1f5850b850a97dfaaf061e?s=96&d=mm&r=g","caption":"Riccardo Coretti"},"url":"https:\/\/www.adriaports.com\/en\/author\/riccardo\/"}]}},"_links":{"self":[{"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/posts\/36044","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/comments?post=36044"}],"version-history":[{"count":1,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/posts\/36044\/revisions"}],"predecessor-version":[{"id":36045,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/posts\/36044\/revisions\/36045"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/media\/35975"}],"wp:attachment":[{"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/media?parent=36044"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/categories?post=36044"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/tags?post=36044"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}