{"id":37913,"date":"2026-03-07T11:48:44","date_gmt":"2026-03-07T10:48:44","guid":{"rendered":"https:\/\/www.adriaports.com\/uncategorized\/koper-divaca-testing-gets-under-way-on-new-rail-line\/"},"modified":"2026-03-14T17:49:27","modified_gmt":"2026-03-14T16:49:27","slug":"koper-divaca-testing-gets-under-way-on-new-rail-line","status":"publish","type":"post","link":"https:\/\/www.adriaports.com\/en\/railways\/koper-divaca-testing-gets-under-way-on-new-rail-line\/","title":{"rendered":"Koper-Diva\u010da, testing gets under way on new rail line"},"content":{"rendered":"<p><strong>TRIESTE &#8211;<\/strong> <strong>Operational tests on the new railway line between Koper and Diva\u010da<\/strong>, designed to increase traffic to and from the Slovenian port, will begin on Monday, March 9.<\/p>\n<p>The tests, scheduled to run until March 11, mark the first operational step after the completion of track connection works along the entire 27-kilometre route. <strong>The trials will be used to verify the line\u2019s operability and the behaviour of the infrastructure as train speeds are progressively increased.<\/strong> During the tests, checks will also be carried out on track stability and on the performance of the different construction systems used along the route.<\/p>\n<p>The new line, in fact, has been built using modern technical solutions, including <strong>slab track and specific transition zones between the rigid structure and conventional ballast track laid on gravel.<\/strong> The presence of these different construction types makes in-depth technical checks necessary before the line can enter service.<\/p>\n<p>The testing phase is a preliminary step ahead of the issuing of the operating permit. The contractor will then have to carry out further measurements and load tests along the line.<\/p>\n<p>The doubling of the Koper-Diva\u010da section is one of Slovenia\u2019s main railway infrastructure projects and aims to increase the capacity of links between the port and Central European markets.<br \/>\n<strong>Construction of the project began in 2019 with the building of access roads to the sites, while the main works started in 2021. In 2026 the line became passable.<\/strong><\/p>\n<p>In recent days, the project was visited by <strong>a delegation from Ukraine and Moldova<\/strong>. Representatives of the ministries and railway institutions of the two countries took part in a study visit to Slovenia to examine experiences related to the development and regulation of rail transport.<\/p>\n<p>During the programme, the delegation met several senior figures from Slovenia\u2019s railway sector and also visited the \u0160kofije tunnel (T8). The initiative forms part of the <strong>\u201cCooperation of Georgia, the Republic of Moldova and Ukraine in the Transport Community\u201d project<\/strong>, which aims to support the gradual integration of Ukraine and Moldova into European transport systems.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>TRIESTE &#8211; Operational tests on the new railway line between Koper and Diva\u010da, designed to increase traffic to and from the Slovenian port, will begin on Monday, March 9.<\/p>\n","protected":false},"author":2,"featured_media":37810,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[25,37],"tags":[],"class_list":["post-37913","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-logistics","category-railways","et-has-post-format-content","et_post_format-et-post-format-standard"],"yoast_head":"\n<title>Koper-Diva\u010da, testing gets under way on new rail line - AdriaPorts<\/title>\n<meta name=\"description\" content=\"The first operational tests on the railway section will take place from March 9 to 11, following completion of the route.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.adriaports.com\/en\/railways\/koper-divaca-testing-gets-under-way-on-new-rail-line\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Koper-Diva\u010da, testing gets under way on new rail line - AdriaPorts\" \/>\n<meta property=\"og:description\" content=\"The first operational tests on the railway section will take place from March 9 to 11, following completion of the route.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.adriaports.com\/en\/railways\/koper-divaca-testing-gets-under-way-on-new-rail-line\/\" \/>\n<meta property=\"og:site_name\" content=\"AdriaPorts\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/AdriaPortsShipping\" \/>\n<meta property=\"article:published_time\" content=\"2026-03-07T10:48:44+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-03-14T16:49:27+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.adriaports.com\/wp-content\/uploads\/2026\/03\/Collegamento-binari-3-3-2026.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1472\" \/>\n\t<meta property=\"og:image:height\" content=\"1056\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Riccardo Coretti\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Riccardo Coretti\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/koper-divaca-testing-gets-under-way-on-new-rail-line\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/koper-divaca-testing-gets-under-way-on-new-rail-line\\\/\"},\"author\":{\"name\":\"Riccardo Coretti\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#\\\/schema\\\/person\\\/e1f4a3e4ab6a5399d77daa3fcfd7e9a4\"},\"headline\":\"Koper-Diva\u010da, testing gets under way on new rail line\",\"datePublished\":\"2026-03-07T10:48:44+00:00\",\"dateModified\":\"2026-03-14T16:49:27+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/koper-divaca-testing-gets-under-way-on-new-rail-line\\\/\"},\"wordCount\":348,\"publisher\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/koper-divaca-testing-gets-under-way-on-new-rail-line\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.adriaports.com\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/Collegamento-binari-3-3-2026.jpg\",\"articleSection\":[\"Logistics\",\"Railways\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/koper-divaca-testing-gets-under-way-on-new-rail-line\\\/\",\"url\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/koper-divaca-testing-gets-under-way-on-new-rail-line\\\/\",\"name\":\"Koper-Diva\u010da, testing gets under way on new rail line - AdriaPorts\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/koper-divaca-testing-gets-under-way-on-new-rail-line\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/koper-divaca-testing-gets-under-way-on-new-rail-line\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.adriaports.com\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/Collegamento-binari-3-3-2026.jpg\",\"datePublished\":\"2026-03-07T10:48:44+00:00\",\"dateModified\":\"2026-03-14T16:49:27+00:00\",\"description\":\"The first operational tests on the railway section will take place from March 9 to 11, following completion of the route.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/koper-divaca-testing-gets-under-way-on-new-rail-line\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/koper-divaca-testing-gets-under-way-on-new-rail-line\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/koper-divaca-testing-gets-under-way-on-new-rail-line\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.adriaports.com\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/Collegamento-binari-3-3-2026.jpg\",\"contentUrl\":\"https:\\\/\\\/www.adriaports.com\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/Collegamento-binari-3-3-2026.jpg\",\"width\":1472,\"height\":1056,\"caption\":\"The final phase of track connection works along the Koper-Diva\u010da line.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/koper-divaca-testing-gets-under-way-on-new-rail-line\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Koper-Diva\u010da, testing gets under way on new rail line\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/\",\"name\":\"AdriaPorts\",\"description\":\"AdriaPorts \u00e8 la principale fonte di notizie su Porti, Logistica, Ferrovie e Cantieri Navali del Nord Adriatico\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#organization\",\"name\":\"AdriaPorts\",\"url\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.adriaports.com\\\/wp-content\\\/uploads\\\/2021\\\/06\\\/logo.svg\",\"contentUrl\":\"https:\\\/\\\/www.adriaports.com\\\/wp-content\\\/uploads\\\/2021\\\/06\\\/logo.svg\",\"width\":678,\"height\":119,\"caption\":\"AdriaPorts\"},\"image\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/AdriaPortsShipping\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/adriaports\\\/\",\"https:\\\/\\\/t.me\\\/adriaports\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#\\\/schema\\\/person\\\/e1f4a3e4ab6a5399d77daa3fcfd7e9a4\",\"name\":\"Riccardo Coretti\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/af80fe5463f86bb046a71d217f7b5541ae6893d2ac1f5850b850a97dfaaf061e?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/af80fe5463f86bb046a71d217f7b5541ae6893d2ac1f5850b850a97dfaaf061e?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/af80fe5463f86bb046a71d217f7b5541ae6893d2ac1f5850b850a97dfaaf061e?s=96&d=mm&r=g\",\"caption\":\"Riccardo Coretti\"},\"url\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/author\\\/riccardo\\\/\"}]}<\/script>\n","yoast_head_json":{"title":"Koper-Diva\u010da, testing gets under way on new rail line - AdriaPorts","description":"The first operational tests on the railway section will take place from March 9 to 11, following completion of the route.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.adriaports.com\/en\/railways\/koper-divaca-testing-gets-under-way-on-new-rail-line\/","og_locale":"en_US","og_type":"article","og_title":"Koper-Diva\u010da, testing gets under way on new rail line - AdriaPorts","og_description":"The first operational tests on the railway section will take place from March 9 to 11, following completion of the route.","og_url":"https:\/\/www.adriaports.com\/en\/railways\/koper-divaca-testing-gets-under-way-on-new-rail-line\/","og_site_name":"AdriaPorts","article_publisher":"https:\/\/www.facebook.com\/AdriaPortsShipping","article_published_time":"2026-03-07T10:48:44+00:00","article_modified_time":"2026-03-14T16:49:27+00:00","og_image":[{"width":1472,"height":1056,"url":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2026\/03\/Collegamento-binari-3-3-2026.jpg","type":"image\/jpeg"}],"author":"Riccardo Coretti","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Riccardo Coretti","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.adriaports.com\/en\/railways\/koper-divaca-testing-gets-under-way-on-new-rail-line\/#article","isPartOf":{"@id":"https:\/\/www.adriaports.com\/en\/railways\/koper-divaca-testing-gets-under-way-on-new-rail-line\/"},"author":{"name":"Riccardo Coretti","@id":"https:\/\/www.adriaports.com\/en\/#\/schema\/person\/e1f4a3e4ab6a5399d77daa3fcfd7e9a4"},"headline":"Koper-Diva\u010da, testing gets under way on new rail line","datePublished":"2026-03-07T10:48:44+00:00","dateModified":"2026-03-14T16:49:27+00:00","mainEntityOfPage":{"@id":"https:\/\/www.adriaports.com\/en\/railways\/koper-divaca-testing-gets-under-way-on-new-rail-line\/"},"wordCount":348,"publisher":{"@id":"https:\/\/www.adriaports.com\/en\/#organization"},"image":{"@id":"https:\/\/www.adriaports.com\/en\/railways\/koper-divaca-testing-gets-under-way-on-new-rail-line\/#primaryimage"},"thumbnailUrl":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2026\/03\/Collegamento-binari-3-3-2026.jpg","articleSection":["Logistics","Railways"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.adriaports.com\/en\/railways\/koper-divaca-testing-gets-under-way-on-new-rail-line\/","url":"https:\/\/www.adriaports.com\/en\/railways\/koper-divaca-testing-gets-under-way-on-new-rail-line\/","name":"Koper-Diva\u010da, testing gets under way on new rail line - AdriaPorts","isPartOf":{"@id":"https:\/\/www.adriaports.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.adriaports.com\/en\/railways\/koper-divaca-testing-gets-under-way-on-new-rail-line\/#primaryimage"},"image":{"@id":"https:\/\/www.adriaports.com\/en\/railways\/koper-divaca-testing-gets-under-way-on-new-rail-line\/#primaryimage"},"thumbnailUrl":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2026\/03\/Collegamento-binari-3-3-2026.jpg","datePublished":"2026-03-07T10:48:44+00:00","dateModified":"2026-03-14T16:49:27+00:00","description":"The first operational tests on the railway section will take place from March 9 to 11, following completion of the route.","breadcrumb":{"@id":"https:\/\/www.adriaports.com\/en\/railways\/koper-divaca-testing-gets-under-way-on-new-rail-line\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.adriaports.com\/en\/railways\/koper-divaca-testing-gets-under-way-on-new-rail-line\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.adriaports.com\/en\/railways\/koper-divaca-testing-gets-under-way-on-new-rail-line\/#primaryimage","url":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2026\/03\/Collegamento-binari-3-3-2026.jpg","contentUrl":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2026\/03\/Collegamento-binari-3-3-2026.jpg","width":1472,"height":1056,"caption":"The final phase of track connection works along the Koper-Diva\u010da line."},{"@type":"BreadcrumbList","@id":"https:\/\/www.adriaports.com\/en\/railways\/koper-divaca-testing-gets-under-way-on-new-rail-line\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.adriaports.com\/en\/"},{"@type":"ListItem","position":2,"name":"Koper-Diva\u010da, testing gets under way on new rail line"}]},{"@type":"WebSite","@id":"https:\/\/www.adriaports.com\/en\/#website","url":"https:\/\/www.adriaports.com\/en\/","name":"AdriaPorts","description":"AdriaPorts \u00e8 la principale fonte di notizie su Porti, Logistica, Ferrovie e Cantieri Navali del Nord Adriatico","publisher":{"@id":"https:\/\/www.adriaports.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.adriaports.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.adriaports.com\/en\/#organization","name":"AdriaPorts","url":"https:\/\/www.adriaports.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.adriaports.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2021\/06\/logo.svg","contentUrl":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2021\/06\/logo.svg","width":678,"height":119,"caption":"AdriaPorts"},"image":{"@id":"https:\/\/www.adriaports.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/AdriaPortsShipping","https:\/\/www.linkedin.com\/company\/adriaports\/","https:\/\/t.me\/adriaports"]},{"@type":"Person","@id":"https:\/\/www.adriaports.com\/en\/#\/schema\/person\/e1f4a3e4ab6a5399d77daa3fcfd7e9a4","name":"Riccardo Coretti","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/af80fe5463f86bb046a71d217f7b5541ae6893d2ac1f5850b850a97dfaaf061e?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/af80fe5463f86bb046a71d217f7b5541ae6893d2ac1f5850b850a97dfaaf061e?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/af80fe5463f86bb046a71d217f7b5541ae6893d2ac1f5850b850a97dfaaf061e?s=96&d=mm&r=g","caption":"Riccardo Coretti"},"url":"https:\/\/www.adriaports.com\/en\/author\/riccardo\/"}]}},"_links":{"self":[{"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/posts\/37913","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/comments?post=37913"}],"version-history":[{"count":1,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/posts\/37913\/revisions"}],"predecessor-version":[{"id":37914,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/posts\/37913\/revisions\/37914"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/media\/37810"}],"wp:attachment":[{"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/media?parent=37913"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/categories?post=37913"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/tags?post=37913"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}