{"id":37994,"date":"2026-03-13T21:23:00","date_gmt":"2026-03-13T20:23:00","guid":{"rendered":"https:\/\/www.adriaports.com\/uncategorized\/pordenone-interport-gets-green-light-for-works-on-intermodal-terminal\/"},"modified":"2026-03-18T10:23:30","modified_gmt":"2026-03-18T09:23:30","slug":"pordenone-interport-gets-green-light-for-works-on-intermodal-terminal","status":"publish","type":"post","link":"https:\/\/www.adriaports.com\/en\/logistics\/pordenone-interport-gets-green-light-for-works-on-intermodal-terminal\/","title":{"rendered":"Pordenone Interport gets green light for works on intermodal terminal"},"content":{"rendered":"<p><strong>TRIESTE &#8211;<\/strong> Pordenone Interport is preparing for new infrastructure and technological works on its intermodal terminal. The City Council has approved <strong>two resolutions that will allow the completion of several rail works and the introduction of digital tools to control logistics flows.<\/strong><\/p>\n<p>The first measure concerns the completion of the intermodal centre through the extension of the rail embankment. The work is part of the project\u2019s second functional phase and <strong>is aimed at extending the shunting yard to a length of 750 metres,<\/strong> in line with the European rail standards required for intermodal freight trains. The intervention will be fully financed by <a href=\"https:\/\/interportocentroingrosso.com\/it\/\" target=\"_blank\" rel=\"noopener\">Interporto Centro Ingrosso di Pordenone Spa.<\/a><\/p>\n<p>The second measure concerns the introduction of <strong>an advanced digital system for monitoring and tracing goods entering and leaving the Interport<\/strong> and the intermodal terminal. The project includes the installation of two structures dedicated to traffic control: an OCR gate and a totem at the terminal entrance.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>TRIESTE &#8211; Pordenone Interport is preparing for new infrastructure and technological works on its intermodal terminal. The City Council has approved two resolutions that will allow the completion of several rail works and the introduction of digital tools to control logistics flows.<\/p>\n","protected":false},"author":2,"featured_media":2441,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[25],"tags":[],"class_list":["post-37994","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-logistics","et-has-post-format-content","et_post_format-et-post-format-standard"],"yoast_head":"\n<title>Pordenone Interport gets green light for works on intermodal terminal - AdriaPorts<\/title>\n<meta name=\"description\" content=\"Two City Council resolutions for track extension and installation of freight flow monitoring systems\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.adriaports.com\/en\/logistics\/pordenone-interport-gets-green-light-for-works-on-intermodal-terminal\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Pordenone Interport gets green light for works on intermodal terminal - AdriaPorts\" \/>\n<meta property=\"og:description\" content=\"Two City Council resolutions for track extension and installation of freight flow monitoring systems\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.adriaports.com\/en\/logistics\/pordenone-interport-gets-green-light-for-works-on-intermodal-terminal\/\" \/>\n<meta property=\"og:site_name\" content=\"AdriaPorts\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/AdriaPortsShipping\" \/>\n<meta property=\"article:published_time\" content=\"2026-03-13T20:23:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-03-18T09:23:30+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.adriaports.com\/wp-content\/uploads\/2021\/12\/Terminal-Interporto-PN-1024x583.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"583\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Riccardo Coretti\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Riccardo Coretti\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/logistics\\\/pordenone-interport-gets-green-light-for-works-on-intermodal-terminal\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/logistics\\\/pordenone-interport-gets-green-light-for-works-on-intermodal-terminal\\\/\"},\"author\":{\"name\":\"Riccardo Coretti\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#\\\/schema\\\/person\\\/e1f4a3e4ab6a5399d77daa3fcfd7e9a4\"},\"headline\":\"Pordenone Interport gets green light for works on intermodal terminal\",\"datePublished\":\"2026-03-13T20:23:00+00:00\",\"dateModified\":\"2026-03-18T09:23:30+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/logistics\\\/pordenone-interport-gets-green-light-for-works-on-intermodal-terminal\\\/\"},\"wordCount\":165,\"publisher\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/logistics\\\/pordenone-interport-gets-green-light-for-works-on-intermodal-terminal\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.adriaports.com\\\/wp-content\\\/uploads\\\/2021\\\/12\\\/Terminal-Interporto-PN.png\",\"articleSection\":[\"Logistics\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/logistics\\\/pordenone-interport-gets-green-light-for-works-on-intermodal-terminal\\\/\",\"url\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/logistics\\\/pordenone-interport-gets-green-light-for-works-on-intermodal-terminal\\\/\",\"name\":\"Pordenone Interport gets green light for works on intermodal terminal - AdriaPorts\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/logistics\\\/pordenone-interport-gets-green-light-for-works-on-intermodal-terminal\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/logistics\\\/pordenone-interport-gets-green-light-for-works-on-intermodal-terminal\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.adriaports.com\\\/wp-content\\\/uploads\\\/2021\\\/12\\\/Terminal-Interporto-PN.png\",\"datePublished\":\"2026-03-13T20:23:00+00:00\",\"dateModified\":\"2026-03-18T09:23:30+00:00\",\"description\":\"Two City Council resolutions for track extension and installation of freight flow monitoring systems\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/logistics\\\/pordenone-interport-gets-green-light-for-works-on-intermodal-terminal\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.adriaports.com\\\/en\\\/logistics\\\/pordenone-interport-gets-green-light-for-works-on-intermodal-terminal\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/logistics\\\/pordenone-interport-gets-green-light-for-works-on-intermodal-terminal\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.adriaports.com\\\/wp-content\\\/uploads\\\/2021\\\/12\\\/Terminal-Interporto-PN.png\",\"contentUrl\":\"https:\\\/\\\/www.adriaports.com\\\/wp-content\\\/uploads\\\/2021\\\/12\\\/Terminal-Interporto-PN.png\",\"width\":4864,\"height\":2769,\"caption\":\"The intermodal terminal at Pordenone Interport.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/logistics\\\/pordenone-interport-gets-green-light-for-works-on-intermodal-terminal\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Pordenone Interport gets green light for works on intermodal terminal\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/\",\"name\":\"AdriaPorts\",\"description\":\"AdriaPorts \u00e8 la principale fonte di notizie su Porti, Logistica, Ferrovie e Cantieri Navali del Nord Adriatico\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#organization\",\"name\":\"AdriaPorts\",\"url\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.adriaports.com\\\/wp-content\\\/uploads\\\/2021\\\/06\\\/logo.svg\",\"contentUrl\":\"https:\\\/\\\/www.adriaports.com\\\/wp-content\\\/uploads\\\/2021\\\/06\\\/logo.svg\",\"width\":678,\"height\":119,\"caption\":\"AdriaPorts\"},\"image\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/AdriaPortsShipping\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/adriaports\\\/\",\"https:\\\/\\\/t.me\\\/adriaports\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#\\\/schema\\\/person\\\/e1f4a3e4ab6a5399d77daa3fcfd7e9a4\",\"name\":\"Riccardo Coretti\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/af80fe5463f86bb046a71d217f7b5541ae6893d2ac1f5850b850a97dfaaf061e?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/af80fe5463f86bb046a71d217f7b5541ae6893d2ac1f5850b850a97dfaaf061e?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/af80fe5463f86bb046a71d217f7b5541ae6893d2ac1f5850b850a97dfaaf061e?s=96&d=mm&r=g\",\"caption\":\"Riccardo Coretti\"},\"url\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/author\\\/riccardo\\\/\"}]}<\/script>\n","yoast_head_json":{"title":"Pordenone Interport gets green light for works on intermodal terminal - AdriaPorts","description":"Two City Council resolutions for track extension and installation of freight flow monitoring systems","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.adriaports.com\/en\/logistics\/pordenone-interport-gets-green-light-for-works-on-intermodal-terminal\/","og_locale":"en_US","og_type":"article","og_title":"Pordenone Interport gets green light for works on intermodal terminal - AdriaPorts","og_description":"Two City Council resolutions for track extension and installation of freight flow monitoring systems","og_url":"https:\/\/www.adriaports.com\/en\/logistics\/pordenone-interport-gets-green-light-for-works-on-intermodal-terminal\/","og_site_name":"AdriaPorts","article_publisher":"https:\/\/www.facebook.com\/AdriaPortsShipping","article_published_time":"2026-03-13T20:23:00+00:00","article_modified_time":"2026-03-18T09:23:30+00:00","og_image":[{"width":1024,"height":583,"url":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2021\/12\/Terminal-Interporto-PN-1024x583.png","type":"image\/png"}],"author":"Riccardo Coretti","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Riccardo Coretti","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.adriaports.com\/en\/logistics\/pordenone-interport-gets-green-light-for-works-on-intermodal-terminal\/#article","isPartOf":{"@id":"https:\/\/www.adriaports.com\/en\/logistics\/pordenone-interport-gets-green-light-for-works-on-intermodal-terminal\/"},"author":{"name":"Riccardo Coretti","@id":"https:\/\/www.adriaports.com\/en\/#\/schema\/person\/e1f4a3e4ab6a5399d77daa3fcfd7e9a4"},"headline":"Pordenone Interport gets green light for works on intermodal terminal","datePublished":"2026-03-13T20:23:00+00:00","dateModified":"2026-03-18T09:23:30+00:00","mainEntityOfPage":{"@id":"https:\/\/www.adriaports.com\/en\/logistics\/pordenone-interport-gets-green-light-for-works-on-intermodal-terminal\/"},"wordCount":165,"publisher":{"@id":"https:\/\/www.adriaports.com\/en\/#organization"},"image":{"@id":"https:\/\/www.adriaports.com\/en\/logistics\/pordenone-interport-gets-green-light-for-works-on-intermodal-terminal\/#primaryimage"},"thumbnailUrl":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2021\/12\/Terminal-Interporto-PN.png","articleSection":["Logistics"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.adriaports.com\/en\/logistics\/pordenone-interport-gets-green-light-for-works-on-intermodal-terminal\/","url":"https:\/\/www.adriaports.com\/en\/logistics\/pordenone-interport-gets-green-light-for-works-on-intermodal-terminal\/","name":"Pordenone Interport gets green light for works on intermodal terminal - AdriaPorts","isPartOf":{"@id":"https:\/\/www.adriaports.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.adriaports.com\/en\/logistics\/pordenone-interport-gets-green-light-for-works-on-intermodal-terminal\/#primaryimage"},"image":{"@id":"https:\/\/www.adriaports.com\/en\/logistics\/pordenone-interport-gets-green-light-for-works-on-intermodal-terminal\/#primaryimage"},"thumbnailUrl":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2021\/12\/Terminal-Interporto-PN.png","datePublished":"2026-03-13T20:23:00+00:00","dateModified":"2026-03-18T09:23:30+00:00","description":"Two City Council resolutions for track extension and installation of freight flow monitoring systems","breadcrumb":{"@id":"https:\/\/www.adriaports.com\/en\/logistics\/pordenone-interport-gets-green-light-for-works-on-intermodal-terminal\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.adriaports.com\/en\/logistics\/pordenone-interport-gets-green-light-for-works-on-intermodal-terminal\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.adriaports.com\/en\/logistics\/pordenone-interport-gets-green-light-for-works-on-intermodal-terminal\/#primaryimage","url":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2021\/12\/Terminal-Interporto-PN.png","contentUrl":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2021\/12\/Terminal-Interporto-PN.png","width":4864,"height":2769,"caption":"The intermodal terminal at Pordenone Interport."},{"@type":"BreadcrumbList","@id":"https:\/\/www.adriaports.com\/en\/logistics\/pordenone-interport-gets-green-light-for-works-on-intermodal-terminal\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.adriaports.com\/en\/"},{"@type":"ListItem","position":2,"name":"Pordenone Interport gets green light for works on intermodal terminal"}]},{"@type":"WebSite","@id":"https:\/\/www.adriaports.com\/en\/#website","url":"https:\/\/www.adriaports.com\/en\/","name":"AdriaPorts","description":"AdriaPorts \u00e8 la principale fonte di notizie su Porti, Logistica, Ferrovie e Cantieri Navali del Nord Adriatico","publisher":{"@id":"https:\/\/www.adriaports.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.adriaports.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.adriaports.com\/en\/#organization","name":"AdriaPorts","url":"https:\/\/www.adriaports.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.adriaports.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2021\/06\/logo.svg","contentUrl":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2021\/06\/logo.svg","width":678,"height":119,"caption":"AdriaPorts"},"image":{"@id":"https:\/\/www.adriaports.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/AdriaPortsShipping","https:\/\/www.linkedin.com\/company\/adriaports\/","https:\/\/t.me\/adriaports"]},{"@type":"Person","@id":"https:\/\/www.adriaports.com\/en\/#\/schema\/person\/e1f4a3e4ab6a5399d77daa3fcfd7e9a4","name":"Riccardo Coretti","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/af80fe5463f86bb046a71d217f7b5541ae6893d2ac1f5850b850a97dfaaf061e?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/af80fe5463f86bb046a71d217f7b5541ae6893d2ac1f5850b850a97dfaaf061e?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/af80fe5463f86bb046a71d217f7b5541ae6893d2ac1f5850b850a97dfaaf061e?s=96&d=mm&r=g","caption":"Riccardo Coretti"},"url":"https:\/\/www.adriaports.com\/en\/author\/riccardo\/"}]}},"_links":{"self":[{"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/posts\/37994","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/comments?post=37994"}],"version-history":[{"count":1,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/posts\/37994\/revisions"}],"predecessor-version":[{"id":37995,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/posts\/37994\/revisions\/37995"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/media\/2441"}],"wp:attachment":[{"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/media?parent=37994"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/categories?post=37994"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/tags?post=37994"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}