{"id":37998,"date":"2026-03-15T10:29:09","date_gmt":"2026-03-15T09:29:09","guid":{"rendered":"https:\/\/www.adriaports.com\/uncategorized\/koper-divaca-railway-e73-million-from-the-eib\/"},"modified":"2026-03-18T10:29:42","modified_gmt":"2026-03-18T09:29:42","slug":"koper-divaca-railway-e73-million-from-the-eib","status":"publish","type":"post","link":"https:\/\/www.adriaports.com\/en\/logistics\/koper-divaca-railway-e73-million-from-the-eib\/","title":{"rendered":"Koper-Diva\u010da railway: \u20ac73 million from the EIB"},"content":{"rendered":"<p><strong>TRIESTE &#8211;<\/strong> <a href=\"https:\/\/drugitir.si\/en\" target=\"_blank\" rel=\"noopener\">Slovenian company 2TDK<\/a> (the project manager) has received from the European Investment Bank <strong>a second \u20ac73 million tranche of financing<\/strong> for the second-track rail project between Koper and Diva\u010da, a strategic infrastructure scheme for links between the port of Koper and central Europe.<\/p>\n<p><a href=\"https:\/\/www.adriaports.com\/it\/ferrovie\/prestito-bei-per-la-nuova-ferrovia-del-porto-di-capodistria\/\">The EIB is one of the project\u2019s main financial partners.<\/a> The European institution often cites the scheme as an example of sound management of major public infrastructure, highlighting the role the new railway line will play in strengthening the region\u2019s logistics connections.<\/p>\n<p>The new loan tranche will allow works along the route to continue without interruption, contributing to the delivery of one of the most significant rail projects for Slovenia since independence. <strong>The scheme is designed to boost rail capacity between the port of Koper and the European network<\/strong>, easing bottlenecks along the corridor linking the Adriatic with Austria, Hungary and other central European markets.<\/p>\n<p>The new railway line extends for <strong>around 27 kilometres along an entirely new alignment, designed to overcome the limits of the current single-track line<\/strong>. The route crosses the Slovenian Karst and includes a major share of underground works: <strong>seven tunnels and three viaducts<\/strong> have been built along the line, underscoring the engineering complexity of the project.<br \/>\nIn recent weeks the scheme has recorded several important operational milestones. <a href=\"https:\/\/www.adriaports.com\/en\/logistics\/first-train-runs-on-the-koper-divaca-line\/\">In recent days, a test train ran along the new route<\/a>, marking a symbolic moment in the project\u2019s progress. The test confirmed the possibility of running trains on the new infrastructure, a necessary step before the next phases of testing and commissioning.<\/p>\n<p>The doubling of the connection is expected to have a direct impact on traffic at the <a href=\"https:\/\/www.adriaports.com\/en\/shipping-en\/port-of-koper-closes-2025-with-e380-million-in-revenue\/\">port of Koper, which in recent years has recorded significant growth especially in the container and automotive segments<\/a>. The current rail link has long represented one of the port\u2019s main development constraints, as the existing line is characterised by steep gradients and limited capacity.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>TRIESTE &#8211; Slovenian company 2TDK (the project manager) has received from the European Investment Bank a second \u20ac73 million tranche of financing for the second-track rail project between Koper and Diva\u010da, a strategic infrastructure scheme for links between the port of Koper and central Europe.<\/p>\n","protected":false},"author":2,"featured_media":37935,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[25,37],"tags":[],"class_list":["post-37998","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-logistics","category-railways","et-has-post-format-content","et_post_format-et-post-format-standard"],"yoast_head":"\n<title>Koper-Diva\u010da railway: \u20ac73 million from the EIB - AdriaPorts<\/title>\n<meta name=\"description\" content=\"The European Investment Bank disburses the second tranche of the loan for the new rail line serving the port\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.adriaports.com\/en\/logistics\/koper-divaca-railway-e73-million-from-the-eib\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Koper-Diva\u010da railway: \u20ac73 million from the EIB - AdriaPorts\" \/>\n<meta property=\"og:description\" content=\"The European Investment Bank disburses the second tranche of the loan for the new rail line serving the port\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.adriaports.com\/en\/logistics\/koper-divaca-railway-e73-million-from-the-eib\/\" \/>\n<meta property=\"og:site_name\" content=\"AdriaPorts\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/AdriaPortsShipping\" \/>\n<meta property=\"article:published_time\" content=\"2026-03-15T09:29:09+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-03-18T09:29:42+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.adriaports.com\/wp-content\/uploads\/2026\/03\/Viadotto-KP-Divaccia.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"1472\" \/>\n\t<meta property=\"og:image:height\" content=\"1056\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Riccardo Coretti\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Riccardo Coretti\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/logistics\\\/koper-divaca-railway-e73-million-from-the-eib\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/logistics\\\/koper-divaca-railway-e73-million-from-the-eib\\\/\"},\"author\":{\"name\":\"Riccardo Coretti\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#\\\/schema\\\/person\\\/e1f4a3e4ab6a5399d77daa3fcfd7e9a4\"},\"headline\":\"Koper-Diva\u010da railway: \u20ac73 million from the EIB\",\"datePublished\":\"2026-03-15T09:29:09+00:00\",\"dateModified\":\"2026-03-18T09:29:42+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/logistics\\\/koper-divaca-railway-e73-million-from-the-eib\\\/\"},\"wordCount\":329,\"publisher\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/logistics\\\/koper-divaca-railway-e73-million-from-the-eib\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.adriaports.com\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/Viadotto-KP-Divaccia.jpeg\",\"articleSection\":[\"Logistics\",\"Railways\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/logistics\\\/koper-divaca-railway-e73-million-from-the-eib\\\/\",\"url\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/logistics\\\/koper-divaca-railway-e73-million-from-the-eib\\\/\",\"name\":\"Koper-Diva\u010da railway: \u20ac73 million from the EIB - AdriaPorts\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/logistics\\\/koper-divaca-railway-e73-million-from-the-eib\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/logistics\\\/koper-divaca-railway-e73-million-from-the-eib\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.adriaports.com\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/Viadotto-KP-Divaccia.jpeg\",\"datePublished\":\"2026-03-15T09:29:09+00:00\",\"dateModified\":\"2026-03-18T09:29:42+00:00\",\"description\":\"The European Investment Bank disburses the second tranche of the loan for the new rail line serving the port\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/logistics\\\/koper-divaca-railway-e73-million-from-the-eib\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.adriaports.com\\\/en\\\/logistics\\\/koper-divaca-railway-e73-million-from-the-eib\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/logistics\\\/koper-divaca-railway-e73-million-from-the-eib\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.adriaports.com\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/Viadotto-KP-Divaccia.jpeg\",\"contentUrl\":\"https:\\\/\\\/www.adriaports.com\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/Viadotto-KP-Divaccia.jpeg\",\"width\":1472,\"height\":1056,\"caption\":\"One of the viaducts on the Koper-Diva\u010da line. In the background, the port of Trieste.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/logistics\\\/koper-divaca-railway-e73-million-from-the-eib\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Koper-Diva\u010da railway: \u20ac73 million from the EIB\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/\",\"name\":\"AdriaPorts\",\"description\":\"AdriaPorts \u00e8 la principale fonte di notizie su Porti, Logistica, Ferrovie e Cantieri Navali del Nord Adriatico\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#organization\",\"name\":\"AdriaPorts\",\"url\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.adriaports.com\\\/wp-content\\\/uploads\\\/2021\\\/06\\\/logo.svg\",\"contentUrl\":\"https:\\\/\\\/www.adriaports.com\\\/wp-content\\\/uploads\\\/2021\\\/06\\\/logo.svg\",\"width\":678,\"height\":119,\"caption\":\"AdriaPorts\"},\"image\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/AdriaPortsShipping\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/adriaports\\\/\",\"https:\\\/\\\/t.me\\\/adriaports\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#\\\/schema\\\/person\\\/e1f4a3e4ab6a5399d77daa3fcfd7e9a4\",\"name\":\"Riccardo Coretti\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/af80fe5463f86bb046a71d217f7b5541ae6893d2ac1f5850b850a97dfaaf061e?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/af80fe5463f86bb046a71d217f7b5541ae6893d2ac1f5850b850a97dfaaf061e?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/af80fe5463f86bb046a71d217f7b5541ae6893d2ac1f5850b850a97dfaaf061e?s=96&d=mm&r=g\",\"caption\":\"Riccardo Coretti\"},\"url\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/author\\\/riccardo\\\/\"}]}<\/script>\n","yoast_head_json":{"title":"Koper-Diva\u010da railway: \u20ac73 million from the EIB - AdriaPorts","description":"The European Investment Bank disburses the second tranche of the loan for the new rail line serving the port","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.adriaports.com\/en\/logistics\/koper-divaca-railway-e73-million-from-the-eib\/","og_locale":"en_US","og_type":"article","og_title":"Koper-Diva\u010da railway: \u20ac73 million from the EIB - AdriaPorts","og_description":"The European Investment Bank disburses the second tranche of the loan for the new rail line serving the port","og_url":"https:\/\/www.adriaports.com\/en\/logistics\/koper-divaca-railway-e73-million-from-the-eib\/","og_site_name":"AdriaPorts","article_publisher":"https:\/\/www.facebook.com\/AdriaPortsShipping","article_published_time":"2026-03-15T09:29:09+00:00","article_modified_time":"2026-03-18T09:29:42+00:00","og_image":[{"width":1472,"height":1056,"url":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2026\/03\/Viadotto-KP-Divaccia.jpeg","type":"image\/jpeg"}],"author":"Riccardo Coretti","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Riccardo Coretti","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.adriaports.com\/en\/logistics\/koper-divaca-railway-e73-million-from-the-eib\/#article","isPartOf":{"@id":"https:\/\/www.adriaports.com\/en\/logistics\/koper-divaca-railway-e73-million-from-the-eib\/"},"author":{"name":"Riccardo Coretti","@id":"https:\/\/www.adriaports.com\/en\/#\/schema\/person\/e1f4a3e4ab6a5399d77daa3fcfd7e9a4"},"headline":"Koper-Diva\u010da railway: \u20ac73 million from the EIB","datePublished":"2026-03-15T09:29:09+00:00","dateModified":"2026-03-18T09:29:42+00:00","mainEntityOfPage":{"@id":"https:\/\/www.adriaports.com\/en\/logistics\/koper-divaca-railway-e73-million-from-the-eib\/"},"wordCount":329,"publisher":{"@id":"https:\/\/www.adriaports.com\/en\/#organization"},"image":{"@id":"https:\/\/www.adriaports.com\/en\/logistics\/koper-divaca-railway-e73-million-from-the-eib\/#primaryimage"},"thumbnailUrl":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2026\/03\/Viadotto-KP-Divaccia.jpeg","articleSection":["Logistics","Railways"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.adriaports.com\/en\/logistics\/koper-divaca-railway-e73-million-from-the-eib\/","url":"https:\/\/www.adriaports.com\/en\/logistics\/koper-divaca-railway-e73-million-from-the-eib\/","name":"Koper-Diva\u010da railway: \u20ac73 million from the EIB - AdriaPorts","isPartOf":{"@id":"https:\/\/www.adriaports.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.adriaports.com\/en\/logistics\/koper-divaca-railway-e73-million-from-the-eib\/#primaryimage"},"image":{"@id":"https:\/\/www.adriaports.com\/en\/logistics\/koper-divaca-railway-e73-million-from-the-eib\/#primaryimage"},"thumbnailUrl":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2026\/03\/Viadotto-KP-Divaccia.jpeg","datePublished":"2026-03-15T09:29:09+00:00","dateModified":"2026-03-18T09:29:42+00:00","description":"The European Investment Bank disburses the second tranche of the loan for the new rail line serving the port","breadcrumb":{"@id":"https:\/\/www.adriaports.com\/en\/logistics\/koper-divaca-railway-e73-million-from-the-eib\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.adriaports.com\/en\/logistics\/koper-divaca-railway-e73-million-from-the-eib\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.adriaports.com\/en\/logistics\/koper-divaca-railway-e73-million-from-the-eib\/#primaryimage","url":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2026\/03\/Viadotto-KP-Divaccia.jpeg","contentUrl":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2026\/03\/Viadotto-KP-Divaccia.jpeg","width":1472,"height":1056,"caption":"One of the viaducts on the Koper-Diva\u010da line. In the background, the port of Trieste."},{"@type":"BreadcrumbList","@id":"https:\/\/www.adriaports.com\/en\/logistics\/koper-divaca-railway-e73-million-from-the-eib\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.adriaports.com\/en\/"},{"@type":"ListItem","position":2,"name":"Koper-Diva\u010da railway: \u20ac73 million from the EIB"}]},{"@type":"WebSite","@id":"https:\/\/www.adriaports.com\/en\/#website","url":"https:\/\/www.adriaports.com\/en\/","name":"AdriaPorts","description":"AdriaPorts \u00e8 la principale fonte di notizie su Porti, Logistica, Ferrovie e Cantieri Navali del Nord Adriatico","publisher":{"@id":"https:\/\/www.adriaports.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.adriaports.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.adriaports.com\/en\/#organization","name":"AdriaPorts","url":"https:\/\/www.adriaports.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.adriaports.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2021\/06\/logo.svg","contentUrl":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2021\/06\/logo.svg","width":678,"height":119,"caption":"AdriaPorts"},"image":{"@id":"https:\/\/www.adriaports.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/AdriaPortsShipping","https:\/\/www.linkedin.com\/company\/adriaports\/","https:\/\/t.me\/adriaports"]},{"@type":"Person","@id":"https:\/\/www.adriaports.com\/en\/#\/schema\/person\/e1f4a3e4ab6a5399d77daa3fcfd7e9a4","name":"Riccardo Coretti","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/af80fe5463f86bb046a71d217f7b5541ae6893d2ac1f5850b850a97dfaaf061e?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/af80fe5463f86bb046a71d217f7b5541ae6893d2ac1f5850b850a97dfaaf061e?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/af80fe5463f86bb046a71d217f7b5541ae6893d2ac1f5850b850a97dfaaf061e?s=96&d=mm&r=g","caption":"Riccardo Coretti"},"url":"https:\/\/www.adriaports.com\/en\/author\/riccardo\/"}]}},"_links":{"self":[{"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/posts\/37998","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/comments?post=37998"}],"version-history":[{"count":1,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/posts\/37998\/revisions"}],"predecessor-version":[{"id":37999,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/posts\/37998\/revisions\/37999"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/media\/37935"}],"wp:attachment":[{"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/media?parent=37998"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/categories?post=37998"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/tags?post=37998"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}