{"id":38405,"date":"2026-04-02T22:05:28","date_gmt":"2026-04-02T20:05:28","guid":{"rendered":"https:\/\/www.adriaports.com\/uncategorized\/porto-marghera-work-picks-up-on-the-rail-bridge-over-the-west-canal\/"},"modified":"2026-04-14T22:36:22","modified_gmt":"2026-04-14T20:36:22","slug":"porto-marghera-work-picks-up-on-the-rail-bridge-over-the-west-canal","status":"publish","type":"post","link":"https:\/\/www.adriaports.com\/en\/railways\/porto-marghera-work-picks-up-on-the-rail-bridge-over-the-west-canal\/","title":{"rendered":"Porto Marghera, work picks up on the rail bridge over the West Canal"},"content":{"rendered":"<p><strong>TRIESTE &#8211;<\/strong> Construction of the <strong>new rail bridge over the West Canal at Porto Marghera<\/strong> is entering its operational phase, with the infrastructure set to improve rail access to the port area.<br \/>\nOne of the most significant steps is <strong>the installation of a tower crane positioned on an artificial island in the middle of the canal<\/strong>. The solution makes it possible to operate in the waterway without blocking navigation. The crane reaches an under-hook height of more than 45 metres above sea level and a maximum height of around 52 metres, allowing materials to be handled with precision.<br \/>\nIts positioning was defined with the support of the Venice Harbour Master\u2019s Office to ensure safety and operational continuity. Throughout all construction phases, the passage of vessels will in fact remain guaranteed, thanks to dedicated corridors and the coordination of activities.<\/p>\n<p>The project, <strong>worth a total of \u20ac28.48 million and scheduled for completion in 2026, is one of the key intermodality schemes in the Venice area<\/strong>. The new bridge will provide a more direct link between the port terminals and the national and European rail network.<img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-38256\" src=\"https:\/\/www.adriaports.com\/wp-content\/uploads\/2026\/04\/IMG-20260402-WA0001-1.jpg\" alt=\"\" width=\"2048\" height=\"1697\" srcset=\"https:\/\/www.adriaports.com\/wp-content\/uploads\/2026\/04\/IMG-20260402-WA0001-1.jpg 2048w, https:\/\/www.adriaports.com\/wp-content\/uploads\/2026\/04\/IMG-20260402-WA0001-1-300x249.jpg 300w, https:\/\/www.adriaports.com\/wp-content\/uploads\/2026\/04\/IMG-20260402-WA0001-1-1024x849.jpg 1024w, https:\/\/www.adriaports.com\/wp-content\/uploads\/2026\/04\/IMG-20260402-WA0001-1-768x636.jpg 768w, https:\/\/www.adriaports.com\/wp-content\/uploads\/2026\/04\/IMG-20260402-WA0001-1-1536x1273.jpg 1536w, https:\/\/www.adriaports.com\/wp-content\/uploads\/2026\/04\/IMG-20260402-WA0001-1-1080x895.jpg 1080w\" sizes=\"(max-width: 2048px) 100vw, 2048px\" \/> <img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-38258\" src=\"https:\/\/www.adriaports.com\/wp-content\/uploads\/2026\/04\/IMG-20260402-WA0003.jpg\" alt=\"\" width=\"1371\" height=\"2048\" srcset=\"https:\/\/www.adriaports.com\/wp-content\/uploads\/2026\/04\/IMG-20260402-WA0003.jpg 1371w, https:\/\/www.adriaports.com\/wp-content\/uploads\/2026\/04\/IMG-20260402-WA0003-201x300.jpg 201w, https:\/\/www.adriaports.com\/wp-content\/uploads\/2026\/04\/IMG-20260402-WA0003-686x1024.jpg 686w, https:\/\/www.adriaports.com\/wp-content\/uploads\/2026\/04\/IMG-20260402-WA0003-768x1147.jpg 768w, https:\/\/www.adriaports.com\/wp-content\/uploads\/2026\/04\/IMG-20260402-WA0003-1028x1536.jpg 1028w, https:\/\/www.adriaports.com\/wp-content\/uploads\/2026\/04\/IMG-20260402-WA0003-1080x1613.jpg 1080w\" sizes=\"(max-width: 1371px) 100vw, 1371px\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>TRIESTE &#8211; Construction of the new rail bridge over the West Canal at Porto Marghera is entering its operational phase, with the infrastructure set to improve rail access to the port area.<\/p>\n","protected":false},"author":2,"featured_media":38255,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[25,37],"tags":[],"class_list":["post-38405","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-logistics","category-railways","et-has-post-format-content","et_post_format-et-post-format-standard"],"yoast_head":"\n<title>Porto Marghera, work picks up on the rail bridge over the West Canal - AdriaPorts<\/title>\n<meta name=\"description\" content=\"Tower crane installed on an artificial island as work continues on a \u20ac28 million project to strengthen terminal links\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.adriaports.com\/en\/railways\/porto-marghera-work-picks-up-on-the-rail-bridge-over-the-west-canal\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Porto Marghera, work picks up on the rail bridge over the West Canal - AdriaPorts\" \/>\n<meta property=\"og:description\" content=\"Tower crane installed on an artificial island as work continues on a \u20ac28 million project to strengthen terminal links\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.adriaports.com\/en\/railways\/porto-marghera-work-picks-up-on-the-rail-bridge-over-the-west-canal\/\" \/>\n<meta property=\"og:site_name\" content=\"AdriaPorts\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/AdriaPortsShipping\" \/>\n<meta property=\"article:published_time\" content=\"2026-04-02T20:05:28+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-14T20:36:22+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.adriaports.com\/wp-content\/uploads\/2026\/04\/IMG-20260402-WA0002.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2048\" \/>\n\t<meta property=\"og:image:height\" content=\"1927\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Riccardo Coretti\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Riccardo Coretti\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/porto-marghera-work-picks-up-on-the-rail-bridge-over-the-west-canal\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/porto-marghera-work-picks-up-on-the-rail-bridge-over-the-west-canal\\\/\"},\"author\":{\"name\":\"Riccardo Coretti\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#\\\/schema\\\/person\\\/e1f4a3e4ab6a5399d77daa3fcfd7e9a4\"},\"headline\":\"Porto Marghera, work picks up on the rail bridge over the West Canal\",\"datePublished\":\"2026-04-02T20:05:28+00:00\",\"dateModified\":\"2026-04-14T20:36:22+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/porto-marghera-work-picks-up-on-the-rail-bridge-over-the-west-canal\\\/\"},\"wordCount\":194,\"publisher\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/porto-marghera-work-picks-up-on-the-rail-bridge-over-the-west-canal\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.adriaports.com\\\/wp-content\\\/uploads\\\/2026\\\/04\\\/IMG-20260402-WA0002.jpg\",\"articleSection\":[\"Logistics\",\"Railways\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/porto-marghera-work-picks-up-on-the-rail-bridge-over-the-west-canal\\\/\",\"url\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/porto-marghera-work-picks-up-on-the-rail-bridge-over-the-west-canal\\\/\",\"name\":\"Porto Marghera, work picks up on the rail bridge over the West Canal - AdriaPorts\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/porto-marghera-work-picks-up-on-the-rail-bridge-over-the-west-canal\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/porto-marghera-work-picks-up-on-the-rail-bridge-over-the-west-canal\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.adriaports.com\\\/wp-content\\\/uploads\\\/2026\\\/04\\\/IMG-20260402-WA0002.jpg\",\"datePublished\":\"2026-04-02T20:05:28+00:00\",\"dateModified\":\"2026-04-14T20:36:22+00:00\",\"description\":\"Tower crane installed on an artificial island as work continues on a \u20ac28 million project to strengthen terminal links\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/porto-marghera-work-picks-up-on-the-rail-bridge-over-the-west-canal\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/porto-marghera-work-picks-up-on-the-rail-bridge-over-the-west-canal\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/porto-marghera-work-picks-up-on-the-rail-bridge-over-the-west-canal\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.adriaports.com\\\/wp-content\\\/uploads\\\/2026\\\/04\\\/IMG-20260402-WA0002.jpg\",\"contentUrl\":\"https:\\\/\\\/www.adriaports.com\\\/wp-content\\\/uploads\\\/2026\\\/04\\\/IMG-20260402-WA0002.jpg\",\"width\":2048,\"height\":1927,\"caption\":\"Work on the rail bridge over the West Canal at Porto Marghera.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/porto-marghera-work-picks-up-on-the-rail-bridge-over-the-west-canal\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Porto Marghera, work picks up on the rail bridge over the West Canal\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/\",\"name\":\"AdriaPorts\",\"description\":\"AdriaPorts \u00e8 la principale fonte di notizie su Porti, Logistica, Ferrovie e Cantieri Navali del Nord Adriatico\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#organization\",\"name\":\"AdriaPorts\",\"url\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.adriaports.com\\\/wp-content\\\/uploads\\\/2021\\\/06\\\/logo.svg\",\"contentUrl\":\"https:\\\/\\\/www.adriaports.com\\\/wp-content\\\/uploads\\\/2021\\\/06\\\/logo.svg\",\"width\":678,\"height\":119,\"caption\":\"AdriaPorts\"},\"image\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/AdriaPortsShipping\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/adriaports\\\/\",\"https:\\\/\\\/t.me\\\/adriaports\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#\\\/schema\\\/person\\\/e1f4a3e4ab6a5399d77daa3fcfd7e9a4\",\"name\":\"Riccardo Coretti\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/af80fe5463f86bb046a71d217f7b5541ae6893d2ac1f5850b850a97dfaaf061e?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/af80fe5463f86bb046a71d217f7b5541ae6893d2ac1f5850b850a97dfaaf061e?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/af80fe5463f86bb046a71d217f7b5541ae6893d2ac1f5850b850a97dfaaf061e?s=96&d=mm&r=g\",\"caption\":\"Riccardo Coretti\"},\"url\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/author\\\/riccardo\\\/\"}]}<\/script>\n","yoast_head_json":{"title":"Porto Marghera, work picks up on the rail bridge over the West Canal - AdriaPorts","description":"Tower crane installed on an artificial island as work continues on a \u20ac28 million project to strengthen terminal links","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.adriaports.com\/en\/railways\/porto-marghera-work-picks-up-on-the-rail-bridge-over-the-west-canal\/","og_locale":"en_US","og_type":"article","og_title":"Porto Marghera, work picks up on the rail bridge over the West Canal - AdriaPorts","og_description":"Tower crane installed on an artificial island as work continues on a \u20ac28 million project to strengthen terminal links","og_url":"https:\/\/www.adriaports.com\/en\/railways\/porto-marghera-work-picks-up-on-the-rail-bridge-over-the-west-canal\/","og_site_name":"AdriaPorts","article_publisher":"https:\/\/www.facebook.com\/AdriaPortsShipping","article_published_time":"2026-04-02T20:05:28+00:00","article_modified_time":"2026-04-14T20:36:22+00:00","og_image":[{"width":2048,"height":1927,"url":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2026\/04\/IMG-20260402-WA0002.jpg","type":"image\/jpeg"}],"author":"Riccardo Coretti","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Riccardo Coretti","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.adriaports.com\/en\/railways\/porto-marghera-work-picks-up-on-the-rail-bridge-over-the-west-canal\/#article","isPartOf":{"@id":"https:\/\/www.adriaports.com\/en\/railways\/porto-marghera-work-picks-up-on-the-rail-bridge-over-the-west-canal\/"},"author":{"name":"Riccardo Coretti","@id":"https:\/\/www.adriaports.com\/en\/#\/schema\/person\/e1f4a3e4ab6a5399d77daa3fcfd7e9a4"},"headline":"Porto Marghera, work picks up on the rail bridge over the West Canal","datePublished":"2026-04-02T20:05:28+00:00","dateModified":"2026-04-14T20:36:22+00:00","mainEntityOfPage":{"@id":"https:\/\/www.adriaports.com\/en\/railways\/porto-marghera-work-picks-up-on-the-rail-bridge-over-the-west-canal\/"},"wordCount":194,"publisher":{"@id":"https:\/\/www.adriaports.com\/en\/#organization"},"image":{"@id":"https:\/\/www.adriaports.com\/en\/railways\/porto-marghera-work-picks-up-on-the-rail-bridge-over-the-west-canal\/#primaryimage"},"thumbnailUrl":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2026\/04\/IMG-20260402-WA0002.jpg","articleSection":["Logistics","Railways"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.adriaports.com\/en\/railways\/porto-marghera-work-picks-up-on-the-rail-bridge-over-the-west-canal\/","url":"https:\/\/www.adriaports.com\/en\/railways\/porto-marghera-work-picks-up-on-the-rail-bridge-over-the-west-canal\/","name":"Porto Marghera, work picks up on the rail bridge over the West Canal - AdriaPorts","isPartOf":{"@id":"https:\/\/www.adriaports.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.adriaports.com\/en\/railways\/porto-marghera-work-picks-up-on-the-rail-bridge-over-the-west-canal\/#primaryimage"},"image":{"@id":"https:\/\/www.adriaports.com\/en\/railways\/porto-marghera-work-picks-up-on-the-rail-bridge-over-the-west-canal\/#primaryimage"},"thumbnailUrl":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2026\/04\/IMG-20260402-WA0002.jpg","datePublished":"2026-04-02T20:05:28+00:00","dateModified":"2026-04-14T20:36:22+00:00","description":"Tower crane installed on an artificial island as work continues on a \u20ac28 million project to strengthen terminal links","breadcrumb":{"@id":"https:\/\/www.adriaports.com\/en\/railways\/porto-marghera-work-picks-up-on-the-rail-bridge-over-the-west-canal\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.adriaports.com\/en\/railways\/porto-marghera-work-picks-up-on-the-rail-bridge-over-the-west-canal\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.adriaports.com\/en\/railways\/porto-marghera-work-picks-up-on-the-rail-bridge-over-the-west-canal\/#primaryimage","url":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2026\/04\/IMG-20260402-WA0002.jpg","contentUrl":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2026\/04\/IMG-20260402-WA0002.jpg","width":2048,"height":1927,"caption":"Work on the rail bridge over the West Canal at Porto Marghera."},{"@type":"BreadcrumbList","@id":"https:\/\/www.adriaports.com\/en\/railways\/porto-marghera-work-picks-up-on-the-rail-bridge-over-the-west-canal\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.adriaports.com\/en\/"},{"@type":"ListItem","position":2,"name":"Porto Marghera, work picks up on the rail bridge over the West Canal"}]},{"@type":"WebSite","@id":"https:\/\/www.adriaports.com\/en\/#website","url":"https:\/\/www.adriaports.com\/en\/","name":"AdriaPorts","description":"AdriaPorts \u00e8 la principale fonte di notizie su Porti, Logistica, Ferrovie e Cantieri Navali del Nord Adriatico","publisher":{"@id":"https:\/\/www.adriaports.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.adriaports.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.adriaports.com\/en\/#organization","name":"AdriaPorts","url":"https:\/\/www.adriaports.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.adriaports.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2021\/06\/logo.svg","contentUrl":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2021\/06\/logo.svg","width":678,"height":119,"caption":"AdriaPorts"},"image":{"@id":"https:\/\/www.adriaports.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/AdriaPortsShipping","https:\/\/www.linkedin.com\/company\/adriaports\/","https:\/\/t.me\/adriaports"]},{"@type":"Person","@id":"https:\/\/www.adriaports.com\/en\/#\/schema\/person\/e1f4a3e4ab6a5399d77daa3fcfd7e9a4","name":"Riccardo Coretti","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/af80fe5463f86bb046a71d217f7b5541ae6893d2ac1f5850b850a97dfaaf061e?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/af80fe5463f86bb046a71d217f7b5541ae6893d2ac1f5850b850a97dfaaf061e?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/af80fe5463f86bb046a71d217f7b5541ae6893d2ac1f5850b850a97dfaaf061e?s=96&d=mm&r=g","caption":"Riccardo Coretti"},"url":"https:\/\/www.adriaports.com\/en\/author\/riccardo\/"}]}},"_links":{"self":[{"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/posts\/38405","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/comments?post=38405"}],"version-history":[{"count":1,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/posts\/38405\/revisions"}],"predecessor-version":[{"id":38406,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/posts\/38405\/revisions\/38406"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/media\/38255"}],"wp:attachment":[{"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/media?parent=38405"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/categories?post=38405"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/tags?post=38405"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}