{"id":39155,"date":"2026-05-13T13:14:43","date_gmt":"2026-05-13T11:14:43","guid":{"rendered":"https:\/\/www.adriaports.com\/uncategorized\/railways-summer-works-in-friuli-venezia-giulia\/"},"modified":"2026-05-22T21:15:24","modified_gmt":"2026-05-22T19:15:24","slug":"railways-summer-works-in-friuli-venezia-giulia","status":"publish","type":"post","link":"https:\/\/www.adriaports.com\/en\/railways\/railways-summer-works-in-friuli-venezia-giulia\/","title":{"rendered":"Railways, summer works in Friuli Venezia Giulia"},"content":{"rendered":"<p><strong>TRIESTE &#8211;<\/strong> Works and closures will also affect Friuli Venezia Giulia under RFI\u2019s 2026 plan, with <strong>operations on three key lines in the region.<\/strong><br \/>\nIn detail, on the Venice-Trieste line, <strong>a closure is scheduled from 19 to 24 May between Portogruaro and Cervignano for the renewal of the steel span of the Latisana bridge and preparatory works for the ACCM system. <\/strong>During the May closure, <strong>100 freight trains will be cancelled and 110 diverted via Udine.<\/strong> Trains from the port of Trieste towards Tarvisio, however, will not be affected.<\/p>\n<p>On the Casarsa-Portogruaro line, maintenance and electrification works will require a longer closure, from 13 July to 23 August. <a href=\"https:\/\/www.adriaports.com\/it\/logistica\/chiusura-ferrovia-tarvisio-regione-fvg-tenta-di-correre-ai-ripari\/\">Finally, on the Tarvisio-Udine line, from 22 August to 20 September<\/a>, the replacement of IPA plates is scheduled between the Italian-Austrian border and Carnia.<\/p>\n<p>The works are part of a national planning framework that <strong>aims to concentrate activities in periods of lower traffic, with longer but targeted closures<\/strong>, in order to reduce the overall impact on rail services in the medium term.<br \/>\nAt national level, the FS Italiane Group currently has <strong>around 1,300 worksites active every day across the network, covering maintenance and new projects, for a total value of 11.6 billion euros in 2025<\/strong>. This is the highest level ever recorded, supported largely by NRRP funds, which allocated 25 billion euros to the group, 18 billion of which had already been invested by early 2026.<\/p>\n<p>The plan has also had significant effects on the economy, with <strong>estimated related economic activity worth 20.5 billion euros and an impact on GDP of 8.6 billion euros, in addition to around 112,000 jobs in the supply chains involved.<\/strong><br \/>\nThe priorities include the development of high-speed rail, stronger links with ports and logistics terminals, network digitalisation and increased climate resilience. In particular, the objective is to expand by 30% the population served by high-speed connections.<br \/>\nAmong the main projects due to enter service by 2027 are new HS\/HC sections such as the Brescia-Verona line and works in the urban nodes of Genoa and Rome, as well as the extension of the ERTMS system on both high-speed and conventional lines.<br \/>\nOverall, <strong>63% of investments are allocated to major projects, while the remaining 37% concerns network maintenance and resilience<\/strong>, in a context of strong growth in planned closures, which have increased by more than 100% compared with 2023 to support the progress of works.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>TRIESTE &#8211; Works and closures will also affect Friuli Venezia Giulia under RFI\u2019s 2026 plan, with operations on three key lines in the region.<\/p>\n","protected":false},"author":2,"featured_media":39037,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[25,37],"tags":[],"class_list":["post-39155","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-logistics","category-railways","et-has-post-format-content","et_post_format-et-post-format-standard"],"yoast_head":"\n<title>Railways, summer works in Friuli Venezia Giulia - AdriaPorts<\/title>\n<meta name=\"description\" content=\"Closures on Venice-Trieste, Casarsa-Portogruaro and Tarvisio-Udine under RFI\u2019s 11.6 billion euro plan covering NRRP-funded and major projects\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.adriaports.com\/en\/railways\/railways-summer-works-in-friuli-venezia-giulia\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Railways, summer works in Friuli Venezia Giulia - AdriaPorts\" \/>\n<meta property=\"og:description\" content=\"Closures on Venice-Trieste, Casarsa-Portogruaro and Tarvisio-Udine under RFI\u2019s 11.6 billion euro plan covering NRRP-funded and major projects\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.adriaports.com\/en\/railways\/railways-summer-works-in-friuli-venezia-giulia\/\" \/>\n<meta property=\"og:site_name\" content=\"AdriaPorts\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/AdriaPortsShipping\" \/>\n<meta property=\"article:published_time\" content=\"2026-05-13T11:14:43+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-22T19:15:24+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.adriaports.com\/wp-content\/uploads\/2026\/05\/Manutenzione-treni-binari.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Riccardo Coretti\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Riccardo Coretti\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/railways-summer-works-in-friuli-venezia-giulia\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/railways-summer-works-in-friuli-venezia-giulia\\\/\"},\"author\":{\"name\":\"Riccardo Coretti\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#\\\/schema\\\/person\\\/e1f4a3e4ab6a5399d77daa3fcfd7e9a4\"},\"headline\":\"Railways, summer works in Friuli Venezia Giulia\",\"datePublished\":\"2026-05-13T11:14:43+00:00\",\"dateModified\":\"2026-05-22T19:15:24+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/railways-summer-works-in-friuli-venezia-giulia\\\/\"},\"wordCount\":381,\"publisher\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/railways-summer-works-in-friuli-venezia-giulia\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.adriaports.com\\\/wp-content\\\/uploads\\\/2026\\\/05\\\/Manutenzione-treni-binari.jpg\",\"articleSection\":[\"Logistics\",\"Railways\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/railways-summer-works-in-friuli-venezia-giulia\\\/\",\"url\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/railways-summer-works-in-friuli-venezia-giulia\\\/\",\"name\":\"Railways, summer works in Friuli Venezia Giulia - AdriaPorts\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/railways-summer-works-in-friuli-venezia-giulia\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/railways-summer-works-in-friuli-venezia-giulia\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.adriaports.com\\\/wp-content\\\/uploads\\\/2026\\\/05\\\/Manutenzione-treni-binari.jpg\",\"datePublished\":\"2026-05-13T11:14:43+00:00\",\"dateModified\":\"2026-05-22T19:15:24+00:00\",\"description\":\"Closures on Venice-Trieste, Casarsa-Portogruaro and Tarvisio-Udine under RFI\u2019s 11.6 billion euro plan covering NRRP-funded and major projects\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/railways-summer-works-in-friuli-venezia-giulia\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/railways-summer-works-in-friuli-venezia-giulia\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/railways-summer-works-in-friuli-venezia-giulia\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.adriaports.com\\\/wp-content\\\/uploads\\\/2026\\\/05\\\/Manutenzione-treni-binari.jpg\",\"contentUrl\":\"https:\\\/\\\/www.adriaports.com\\\/wp-content\\\/uploads\\\/2026\\\/05\\\/Manutenzione-treni-binari.jpg\",\"width\":1672,\"height\":941,\"caption\":\"Railway maintenance in an archive photo.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/railways-summer-works-in-friuli-venezia-giulia\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Railways, summer works in Friuli Venezia Giulia\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/\",\"name\":\"AdriaPorts\",\"description\":\"AdriaPorts \u00e8 la principale fonte di notizie su Porti, Logistica, Ferrovie e Cantieri Navali del Nord Adriatico\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#organization\",\"name\":\"AdriaPorts\",\"url\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.adriaports.com\\\/wp-content\\\/uploads\\\/2021\\\/06\\\/logo.svg\",\"contentUrl\":\"https:\\\/\\\/www.adriaports.com\\\/wp-content\\\/uploads\\\/2021\\\/06\\\/logo.svg\",\"width\":678,\"height\":119,\"caption\":\"AdriaPorts\"},\"image\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/AdriaPortsShipping\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/adriaports\\\/\",\"https:\\\/\\\/t.me\\\/adriaports\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#\\\/schema\\\/person\\\/e1f4a3e4ab6a5399d77daa3fcfd7e9a4\",\"name\":\"Riccardo Coretti\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/af80fe5463f86bb046a71d217f7b5541ae6893d2ac1f5850b850a97dfaaf061e?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/af80fe5463f86bb046a71d217f7b5541ae6893d2ac1f5850b850a97dfaaf061e?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/af80fe5463f86bb046a71d217f7b5541ae6893d2ac1f5850b850a97dfaaf061e?s=96&d=mm&r=g\",\"caption\":\"Riccardo Coretti\"},\"url\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/author\\\/riccardo\\\/\"}]}<\/script>\n","yoast_head_json":{"title":"Railways, summer works in Friuli Venezia Giulia - AdriaPorts","description":"Closures on Venice-Trieste, Casarsa-Portogruaro and Tarvisio-Udine under RFI\u2019s 11.6 billion euro plan covering NRRP-funded and major projects","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.adriaports.com\/en\/railways\/railways-summer-works-in-friuli-venezia-giulia\/","og_locale":"en_US","og_type":"article","og_title":"Railways, summer works in Friuli Venezia Giulia - AdriaPorts","og_description":"Closures on Venice-Trieste, Casarsa-Portogruaro and Tarvisio-Udine under RFI\u2019s 11.6 billion euro plan covering NRRP-funded and major projects","og_url":"https:\/\/www.adriaports.com\/en\/railways\/railways-summer-works-in-friuli-venezia-giulia\/","og_site_name":"AdriaPorts","article_publisher":"https:\/\/www.facebook.com\/AdriaPortsShipping","article_published_time":"2026-05-13T11:14:43+00:00","article_modified_time":"2026-05-22T19:15:24+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2026\/05\/Manutenzione-treni-binari.jpg","type":"image\/jpeg"}],"author":"Riccardo Coretti","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Riccardo Coretti","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.adriaports.com\/en\/railways\/railways-summer-works-in-friuli-venezia-giulia\/#article","isPartOf":{"@id":"https:\/\/www.adriaports.com\/en\/railways\/railways-summer-works-in-friuli-venezia-giulia\/"},"author":{"name":"Riccardo Coretti","@id":"https:\/\/www.adriaports.com\/en\/#\/schema\/person\/e1f4a3e4ab6a5399d77daa3fcfd7e9a4"},"headline":"Railways, summer works in Friuli Venezia Giulia","datePublished":"2026-05-13T11:14:43+00:00","dateModified":"2026-05-22T19:15:24+00:00","mainEntityOfPage":{"@id":"https:\/\/www.adriaports.com\/en\/railways\/railways-summer-works-in-friuli-venezia-giulia\/"},"wordCount":381,"publisher":{"@id":"https:\/\/www.adriaports.com\/en\/#organization"},"image":{"@id":"https:\/\/www.adriaports.com\/en\/railways\/railways-summer-works-in-friuli-venezia-giulia\/#primaryimage"},"thumbnailUrl":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2026\/05\/Manutenzione-treni-binari.jpg","articleSection":["Logistics","Railways"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.adriaports.com\/en\/railways\/railways-summer-works-in-friuli-venezia-giulia\/","url":"https:\/\/www.adriaports.com\/en\/railways\/railways-summer-works-in-friuli-venezia-giulia\/","name":"Railways, summer works in Friuli Venezia Giulia - AdriaPorts","isPartOf":{"@id":"https:\/\/www.adriaports.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.adriaports.com\/en\/railways\/railways-summer-works-in-friuli-venezia-giulia\/#primaryimage"},"image":{"@id":"https:\/\/www.adriaports.com\/en\/railways\/railways-summer-works-in-friuli-venezia-giulia\/#primaryimage"},"thumbnailUrl":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2026\/05\/Manutenzione-treni-binari.jpg","datePublished":"2026-05-13T11:14:43+00:00","dateModified":"2026-05-22T19:15:24+00:00","description":"Closures on Venice-Trieste, Casarsa-Portogruaro and Tarvisio-Udine under RFI\u2019s 11.6 billion euro plan covering NRRP-funded and major projects","breadcrumb":{"@id":"https:\/\/www.adriaports.com\/en\/railways\/railways-summer-works-in-friuli-venezia-giulia\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.adriaports.com\/en\/railways\/railways-summer-works-in-friuli-venezia-giulia\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.adriaports.com\/en\/railways\/railways-summer-works-in-friuli-venezia-giulia\/#primaryimage","url":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2026\/05\/Manutenzione-treni-binari.jpg","contentUrl":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2026\/05\/Manutenzione-treni-binari.jpg","width":1672,"height":941,"caption":"Railway maintenance in an archive photo."},{"@type":"BreadcrumbList","@id":"https:\/\/www.adriaports.com\/en\/railways\/railways-summer-works-in-friuli-venezia-giulia\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.adriaports.com\/en\/"},{"@type":"ListItem","position":2,"name":"Railways, summer works in Friuli Venezia Giulia"}]},{"@type":"WebSite","@id":"https:\/\/www.adriaports.com\/en\/#website","url":"https:\/\/www.adriaports.com\/en\/","name":"AdriaPorts","description":"AdriaPorts \u00e8 la principale fonte di notizie su Porti, Logistica, Ferrovie e Cantieri Navali del Nord Adriatico","publisher":{"@id":"https:\/\/www.adriaports.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.adriaports.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.adriaports.com\/en\/#organization","name":"AdriaPorts","url":"https:\/\/www.adriaports.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.adriaports.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2021\/06\/logo.svg","contentUrl":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2021\/06\/logo.svg","width":678,"height":119,"caption":"AdriaPorts"},"image":{"@id":"https:\/\/www.adriaports.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/AdriaPortsShipping","https:\/\/www.linkedin.com\/company\/adriaports\/","https:\/\/t.me\/adriaports"]},{"@type":"Person","@id":"https:\/\/www.adriaports.com\/en\/#\/schema\/person\/e1f4a3e4ab6a5399d77daa3fcfd7e9a4","name":"Riccardo Coretti","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/af80fe5463f86bb046a71d217f7b5541ae6893d2ac1f5850b850a97dfaaf061e?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/af80fe5463f86bb046a71d217f7b5541ae6893d2ac1f5850b850a97dfaaf061e?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/af80fe5463f86bb046a71d217f7b5541ae6893d2ac1f5850b850a97dfaaf061e?s=96&d=mm&r=g","caption":"Riccardo Coretti"},"url":"https:\/\/www.adriaports.com\/en\/author\/riccardo\/"}]}},"_links":{"self":[{"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/posts\/39155","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/comments?post=39155"}],"version-history":[{"count":1,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/posts\/39155\/revisions"}],"predecessor-version":[{"id":39156,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/posts\/39155\/revisions\/39156"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/media\/39037"}],"wp:attachment":[{"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/media?parent=39155"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/categories?post=39155"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/tags?post=39155"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}