{"id":39430,"date":"2026-06-02T19:39:27","date_gmt":"2026-06-02T17:39:27","guid":{"rendered":"https:\/\/www.adriaports.com\/uncategorized\/koper-divaca-railway-procedure-begins-for-entry-into-service\/"},"modified":"2026-06-03T19:40:43","modified_gmt":"2026-06-03T17:40:43","slug":"koper-divaca-railway-procedure-begins-for-entry-into-service","status":"publish","type":"post","link":"https:\/\/www.adriaports.com\/en\/railways\/koper-divaca-railway-procedure-begins-for-entry-into-service\/","title":{"rendered":"Koper-Diva\u010da railway, procedure begins for entry into service"},"content":{"rendered":"<p><strong>TRIESTE &#8211;<\/strong> The new <strong>railway line between the port of Koper and Diva\u010da has begun the procedure for entering service.<\/strong><\/p>\n<p>The company <a href=\"https:\/\/drugitir.si\/\" target=\"_blank\" rel=\"noopener\">2TDK<\/a> has submitted to the <strong>Slovenian Ministry of Natural Resources and Spatial Planning the application to obtain the infrastructure use permit<\/strong>, an essential requirement for launching the subsequent procedures that will lead to the regular operation of the line.<\/p>\n<p><a href=\"https:\/\/www.adriaports.com\/it\/logistica\/primo-treno-sulla-capodistria-divaccia\/\">The section, which became passable as early as last March<\/a>, is one of the most important infrastructure investments carried out in Slovenia in recent years and represents a strategic element for the development of the port of Koper. The procedure for issuing the permit involves checking all the requirements needed for the safety of the infrastructure, including the civil works completed, geotechnical works, railway safety systems and compliance with environmental and technical requirements. <strong>Once the green light has been obtained, authorisation to start railway operations will also be required, the final step for the full integration of the new line into the national network.<\/strong><\/p>\n<p>Construction of the new railway <strong>began in 2021 and faced numerous technical difficulties<\/strong>. During excavation works, several karst cavities were identified, some of which required specific intervention to overcome them, while one of the main critical issues was the movement of the rock mass in the Glin\u0161\u010dica valley, which required extraordinary consolidation measures.<\/p>\n<p>At the same time, 2TDK is already looking ahead to the construction of the <a href=\"https:\/\/www.adriaports.com\/it\/logistica\/la-slovenia-accelera-sul-raddoppio-della-capodistria-divaccia\/\">parallel track<\/a>. <strong>The company has published a tender for preventive archaeological investigations along some sections of the future route<\/strong>, particularly in the Ospo area, where sites of archaeological interest have already been identified. The activities will include analysis of the existing documentation, exploratory excavations and the preparation of a final technical report. <strong>The works must be completed within twelve months of the start of the assignment<\/strong>, while the deadline for submitting bids is set for 10 June.<br \/>\nInvestigations carried out in previous years along the route of the right-hand track had already brought to light finds of considerable historical interest. The discoveries include the remains of a Roman villa rustica dating back to the 1st century AD.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>TRIESTE &#8211; The new railway line between the port of Koper and Diva\u010da has begun the procedure for entering service.<\/p>\n","protected":false},"author":4,"featured_media":6009,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[25,37],"tags":[],"class_list":["post-39430","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-logistics","category-railways","et-has-post-format-content","et_post_format-et-post-format-standard"],"yoast_head":"\n<title>Koper-Diva\u010da railway, procedure begins for entry into service - AdriaPorts<\/title>\n<meta name=\"description\" content=\"Application submitted for the use permit for the new line. Preliminary works for the second track continue\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.adriaports.com\/en\/railways\/koper-divaca-railway-procedure-begins-for-entry-into-service\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Koper-Diva\u010da railway, procedure begins for entry into service - AdriaPorts\" \/>\n<meta property=\"og:description\" content=\"Application submitted for the use permit for the new line. Preliminary works for the second track continue\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.adriaports.com\/en\/railways\/koper-divaca-railway-procedure-begins-for-entry-into-service\/\" \/>\n<meta property=\"og:site_name\" content=\"AdriaPorts\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/AdriaPortsShipping\" \/>\n<meta property=\"article:published_time\" content=\"2026-06-02T17:39:27+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-03T17:40:43+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.adriaports.com\/wp-content\/uploads\/2023\/02\/KpDivaccia-credits-2TDK.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1500\" \/>\n\t<meta property=\"og:image:height\" content=\"945\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Alessia Belverato\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Alessia Belverato\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/koper-divaca-railway-procedure-begins-for-entry-into-service\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/koper-divaca-railway-procedure-begins-for-entry-into-service\\\/\"},\"author\":{\"name\":\"Alessia Belverato\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#\\\/schema\\\/person\\\/4999fc1ff39b8dd10f373739862bdb93\"},\"headline\":\"Koper-Diva\u010da railway, procedure begins for entry into service\",\"datePublished\":\"2026-06-02T17:39:27+00:00\",\"dateModified\":\"2026-06-03T17:40:43+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/koper-divaca-railway-procedure-begins-for-entry-into-service\\\/\"},\"wordCount\":358,\"publisher\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/koper-divaca-railway-procedure-begins-for-entry-into-service\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.adriaports.com\\\/wp-content\\\/uploads\\\/2023\\\/02\\\/KpDivaccia-credits-2TDK.jpg\",\"articleSection\":[\"Logistics\",\"Railways\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/koper-divaca-railway-procedure-begins-for-entry-into-service\\\/\",\"url\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/koper-divaca-railway-procedure-begins-for-entry-into-service\\\/\",\"name\":\"Koper-Diva\u010da railway, procedure begins for entry into service - AdriaPorts\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/koper-divaca-railway-procedure-begins-for-entry-into-service\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/koper-divaca-railway-procedure-begins-for-entry-into-service\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.adriaports.com\\\/wp-content\\\/uploads\\\/2023\\\/02\\\/KpDivaccia-credits-2TDK.jpg\",\"datePublished\":\"2026-06-02T17:39:27+00:00\",\"dateModified\":\"2026-06-03T17:40:43+00:00\",\"description\":\"Application submitted for the use permit for the new line. Preliminary works for the second track continue\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/koper-divaca-railway-procedure-begins-for-entry-into-service\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/koper-divaca-railway-procedure-begins-for-entry-into-service\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/koper-divaca-railway-procedure-begins-for-entry-into-service\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.adriaports.com\\\/wp-content\\\/uploads\\\/2023\\\/02\\\/KpDivaccia-credits-2TDK.jpg\",\"contentUrl\":\"https:\\\/\\\/www.adriaports.com\\\/wp-content\\\/uploads\\\/2023\\\/02\\\/KpDivaccia-credits-2TDK.jpg\",\"width\":1500,\"height\":945,\"caption\":\"A section of the railway line between the port of Koper and the Diva\u010da junction.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/railways\\\/koper-divaca-railway-procedure-begins-for-entry-into-service\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Koper-Diva\u010da railway, procedure begins for entry into service\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/\",\"name\":\"AdriaPorts\",\"description\":\"AdriaPorts \u00e8 la principale fonte di notizie su Porti, Logistica, Ferrovie e Cantieri Navali del Nord Adriatico\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#organization\",\"name\":\"AdriaPorts\",\"url\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.adriaports.com\\\/wp-content\\\/uploads\\\/2021\\\/06\\\/logo.svg\",\"contentUrl\":\"https:\\\/\\\/www.adriaports.com\\\/wp-content\\\/uploads\\\/2021\\\/06\\\/logo.svg\",\"width\":678,\"height\":119,\"caption\":\"AdriaPorts\"},\"image\":{\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/AdriaPortsShipping\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/adriaports\\\/\",\"https:\\\/\\\/t.me\\\/adriaports\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/#\\\/schema\\\/person\\\/4999fc1ff39b8dd10f373739862bdb93\",\"name\":\"Alessia Belverato\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d61528a69b7387fbec55d3f5a7ee13db0babc0d59a4dac3cf6a8730e996bf391?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d61528a69b7387fbec55d3f5a7ee13db0babc0d59a4dac3cf6a8730e996bf391?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d61528a69b7387fbec55d3f5a7ee13db0babc0d59a4dac3cf6a8730e996bf391?s=96&d=mm&r=g\",\"caption\":\"Alessia Belverato\"},\"url\":\"https:\\\/\\\/www.adriaports.com\\\/en\\\/author\\\/alessia\\\/\"}]}<\/script>\n","yoast_head_json":{"title":"Koper-Diva\u010da railway, procedure begins for entry into service - AdriaPorts","description":"Application submitted for the use permit for the new line. Preliminary works for the second track continue","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.adriaports.com\/en\/railways\/koper-divaca-railway-procedure-begins-for-entry-into-service\/","og_locale":"en_US","og_type":"article","og_title":"Koper-Diva\u010da railway, procedure begins for entry into service - AdriaPorts","og_description":"Application submitted for the use permit for the new line. Preliminary works for the second track continue","og_url":"https:\/\/www.adriaports.com\/en\/railways\/koper-divaca-railway-procedure-begins-for-entry-into-service\/","og_site_name":"AdriaPorts","article_publisher":"https:\/\/www.facebook.com\/AdriaPortsShipping","article_published_time":"2026-06-02T17:39:27+00:00","article_modified_time":"2026-06-03T17:40:43+00:00","og_image":[{"width":1500,"height":945,"url":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2023\/02\/KpDivaccia-credits-2TDK.jpg","type":"image\/jpeg"}],"author":"Alessia Belverato","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Alessia Belverato","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.adriaports.com\/en\/railways\/koper-divaca-railway-procedure-begins-for-entry-into-service\/#article","isPartOf":{"@id":"https:\/\/www.adriaports.com\/en\/railways\/koper-divaca-railway-procedure-begins-for-entry-into-service\/"},"author":{"name":"Alessia Belverato","@id":"https:\/\/www.adriaports.com\/en\/#\/schema\/person\/4999fc1ff39b8dd10f373739862bdb93"},"headline":"Koper-Diva\u010da railway, procedure begins for entry into service","datePublished":"2026-06-02T17:39:27+00:00","dateModified":"2026-06-03T17:40:43+00:00","mainEntityOfPage":{"@id":"https:\/\/www.adriaports.com\/en\/railways\/koper-divaca-railway-procedure-begins-for-entry-into-service\/"},"wordCount":358,"publisher":{"@id":"https:\/\/www.adriaports.com\/en\/#organization"},"image":{"@id":"https:\/\/www.adriaports.com\/en\/railways\/koper-divaca-railway-procedure-begins-for-entry-into-service\/#primaryimage"},"thumbnailUrl":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2023\/02\/KpDivaccia-credits-2TDK.jpg","articleSection":["Logistics","Railways"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.adriaports.com\/en\/railways\/koper-divaca-railway-procedure-begins-for-entry-into-service\/","url":"https:\/\/www.adriaports.com\/en\/railways\/koper-divaca-railway-procedure-begins-for-entry-into-service\/","name":"Koper-Diva\u010da railway, procedure begins for entry into service - AdriaPorts","isPartOf":{"@id":"https:\/\/www.adriaports.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.adriaports.com\/en\/railways\/koper-divaca-railway-procedure-begins-for-entry-into-service\/#primaryimage"},"image":{"@id":"https:\/\/www.adriaports.com\/en\/railways\/koper-divaca-railway-procedure-begins-for-entry-into-service\/#primaryimage"},"thumbnailUrl":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2023\/02\/KpDivaccia-credits-2TDK.jpg","datePublished":"2026-06-02T17:39:27+00:00","dateModified":"2026-06-03T17:40:43+00:00","description":"Application submitted for the use permit for the new line. Preliminary works for the second track continue","breadcrumb":{"@id":"https:\/\/www.adriaports.com\/en\/railways\/koper-divaca-railway-procedure-begins-for-entry-into-service\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.adriaports.com\/en\/railways\/koper-divaca-railway-procedure-begins-for-entry-into-service\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.adriaports.com\/en\/railways\/koper-divaca-railway-procedure-begins-for-entry-into-service\/#primaryimage","url":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2023\/02\/KpDivaccia-credits-2TDK.jpg","contentUrl":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2023\/02\/KpDivaccia-credits-2TDK.jpg","width":1500,"height":945,"caption":"A section of the railway line between the port of Koper and the Diva\u010da junction."},{"@type":"BreadcrumbList","@id":"https:\/\/www.adriaports.com\/en\/railways\/koper-divaca-railway-procedure-begins-for-entry-into-service\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.adriaports.com\/en\/"},{"@type":"ListItem","position":2,"name":"Koper-Diva\u010da railway, procedure begins for entry into service"}]},{"@type":"WebSite","@id":"https:\/\/www.adriaports.com\/en\/#website","url":"https:\/\/www.adriaports.com\/en\/","name":"AdriaPorts","description":"AdriaPorts \u00e8 la principale fonte di notizie su Porti, Logistica, Ferrovie e Cantieri Navali del Nord Adriatico","publisher":{"@id":"https:\/\/www.adriaports.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.adriaports.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.adriaports.com\/en\/#organization","name":"AdriaPorts","url":"https:\/\/www.adriaports.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.adriaports.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2021\/06\/logo.svg","contentUrl":"https:\/\/www.adriaports.com\/wp-content\/uploads\/2021\/06\/logo.svg","width":678,"height":119,"caption":"AdriaPorts"},"image":{"@id":"https:\/\/www.adriaports.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/AdriaPortsShipping","https:\/\/www.linkedin.com\/company\/adriaports\/","https:\/\/t.me\/adriaports"]},{"@type":"Person","@id":"https:\/\/www.adriaports.com\/en\/#\/schema\/person\/4999fc1ff39b8dd10f373739862bdb93","name":"Alessia Belverato","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/d61528a69b7387fbec55d3f5a7ee13db0babc0d59a4dac3cf6a8730e996bf391?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d61528a69b7387fbec55d3f5a7ee13db0babc0d59a4dac3cf6a8730e996bf391?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d61528a69b7387fbec55d3f5a7ee13db0babc0d59a4dac3cf6a8730e996bf391?s=96&d=mm&r=g","caption":"Alessia Belverato"},"url":"https:\/\/www.adriaports.com\/en\/author\/alessia\/"}]}},"_links":{"self":[{"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/posts\/39430","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/comments?post=39430"}],"version-history":[{"count":1,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/posts\/39430\/revisions"}],"predecessor-version":[{"id":39431,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/posts\/39430\/revisions\/39431"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/media\/6009"}],"wp:attachment":[{"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/media?parent=39430"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/categories?post=39430"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.adriaports.com\/en\/wp-json\/wp\/v2\/tags?post=39430"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}